3.2.12 Building the Project GIS

Building a preliminary site model from the office before anyone goes to the field: maps, records, history and hazards.
Author: Daniel P. Colwell
3.2.12 Building the Project GIS

A project GIS keeps every layer of the desktop study on one map in one coordinate system, so the data can be overlaid, queried and handed on. The workflow below follows the standard steps in desktop GIS software (Law and Collins 2016) applied to a railroad corridor.

3.2.12.1 Workflow

  1. Set up the project and the geodatabase. Create one project with a file geodatabase that holds all feature classes and rasters. Choose one projected coordinate system for the whole job, normally the State Plane zone on NAD 83 in US survey feet, and record it in the deliverable.
  2. Load the base layers. Track centerline with mileposts, right-of-way, structures and culverts from the owner; topographic maps; aerial imagery; soil survey (Section 3.2.10); geologic, mine and karst maps; flood maps; previous borings.
  3. Georeference scanned maps. Old valuation maps, track charts and boring location plans are scanned images with no coordinates. Place control points on features that still exist (bridges, road crossings, mileposts), check the residual error the software reports, and record it; an error of tens of feet is common on old maps.
  4. Derive terrain layers from the LiDAR DEM. Hillshade (lit from more than one direction, so features of any orientation show), slope classified at break points such as 2H:1V and 1.5H:1V, contours, and profiles along the centerline and across cuts and fills.
  5. Geoprocess along the corridor. Buffer the centerline (for example 500 ft each side) and clip the soil, geology and hazard layers to it; intersect to list map units and hazards by milepost; summarize lengths of each.
  6. Join attribute data. Link boring logs, slide inventory, track geometry defects and maintenance records to points and line segments, so that patterns can be queried (for example, all surfacing defects on high shrink–swell soil).
  7. Lay out and share. Produce strip maps at a fixed scale with milepost grid, legend and sources; export layers to KMZ for field tablets and for the GHRM risk assessment app.

For railroad work: Use the railroad's own milepost and valuation station system as an attribute on every feature, because that is how track forces locate problems. Keep raw and derived data separate in the geodatabase, note the source and date of every layer, and save the project with the report so the next study starts from it rather than from scratch.

3.2.12.2 Sources

  1. Law, M. and Collins, A. (2016). Getting to Know ArcGIS Pro. Redlands, CA: Esri Press.