For a water-sensitive site (a fill across a creek, a culvert, a slope above a river), the desktop study also sets the numbers the site will be watched against: the culvert capacity storm, the river stage at which water reaches the toe, and the antecedent rainfall that has preceded past failures. These become the thresholds of the live risk rating (Section 3.8.26) and the trigger rating of Section 3.8.18.
Figure 3.2-2. How rainfall becomes runoff and flooding. The desktop study identifies which part of this chain controls the site: the storm, the catchment, the culvert or the river.
Dams near the line: list dams upstream and downstream of each bridge and reservoir shore embankment from the National Inventory of Dams and state dam safety records, and note any planned removal, drawdown or rehabilitation. Effects on the track and what to check are in Chapter 2.8, Section 2.8.15.