6.6.7 Water, Drainage and Ice

Inspection, assessment, repair and clearance improvement of existing railroad tunnels and their portals.
Author: Daniel P. Colwell
6.6.7 Water, Drainage and Ice

Water is behind most tunnel deterioration. It washes fines from behind linings, corrodes steel and reinforcement, softens shale and clay, fouls the ballast, and near the portals freezes into icicles and ice columns that foul the clearance envelope or fall onto trains.

  • Map leaks by station and flow on each inspection, separately for wet and dry seasons. A change in flow or in the color or sediment of the water is significant.
  • Keep sidewall ditches and invert drains clear and graded to an outfall. Many old tunnels have drains that have silted up or been covered by ballast.
  • Near portals, where freezing reaches into the tunnel, ice forms where water enters. Ice can be removed by crews, intercepted at the source (drains behind the lining, grouting of leaks) or prevented by insulated or heated drainage and portal doors in extreme climates.

For railroad work: Ice in the clearance envelope is a train-safety issue. In cold regions, set an ice inspection and removal routine for the winter months, and record where ice forms each year so the water sources can be treated in summer. Do not grout off leaks without providing another drainage path, or water pressure will build behind the lining.