Supplemental references for this chapter. Links open the publisher or agency page, or a search for the reference.
- Federal Highway Administration and Federal Transit Administration (2005). Highway and Rail Transit Tunnel Inspection Manual. Publication No. FHWA-IF-05-002. Washington, DC: FHWA. Superseded by the TOMIE Manual [S2]; still useful for its rail transit tunnel elements and defect descriptions. FHWA copy (marked superseded) ↗
- Federal Highway Administration (2015). Tunnel Operations, Maintenance, Inspection, and Evaluation (TOMIE) Manual. Publication No. FHWA-HIF-15-005. Washington, DC: FHWA. Incorporated by reference in the National Tunnel Inspection Standards, 23 CFR 650 Subpart E. Official page ↗
- Federal Highway Administration and Federal Transit Administration (2005). Highway and Rail Transit Tunnel Maintenance and Rehabilitation Manual. Publication No. FHWA-IF-05-017. Washington, DC: FHWA. Archived FHWA page ↗
- Feng, X.-T. (ed.) (2017). Rock Mechanics and Engineering, Volume 4: Excavation, Support and Monitoring. Leiden: CRC Press/Balkema. Chapters used: Aksoy and Gulsev Uyar (Ch. 6), Akutagawa (Ch. 7), Sharifzadeh, Ghorbani and Yasrobi (Ch. 15), Wang and Gage (Ch. 17), Feng, Wang and Röshoff (Ch. 18). Find source ↗
- Barton, N., Lien, R. and Lunde, J. (1974). “Engineering classification of rock masses for the design of tunnel support.” Rock Mechanics, 6(4), 189–236. Find source ↗
- Grimstad, E. and Barton, N. (1993). “Updating the Q-system for NMT.” Proc. Int. Symp. on Sprayed Concrete, Fagernes, Norway. Oslo: Norwegian Concrete Association. Find source ↗
- Hoek, E. (2007). Practical Rock Engineering. RocScience course notes. Official page ↗
- American Railway Engineering and Maintenance-of-Way Association (2026). Manual for Railway Engineering. Chapter 1, Roadway and Ballast, Part 8, Tunnels (Sections 8.4 Design, 8.5 Maintenance and Construction, 8.7 Ventilation); Chapter 28, Clearances. Lanham, MD: AREMA. Official page ↗
Related GHRM chapters: rock and rock mass classification (Chapter 2.7); mining and man-made hazards (Chapter 3.10); risk ratings (Chapter 3.8); construction monitoring (Chapter 5.3); rock cut design (Chapter 6.3); earthworks asset management (Chapter 7.4).