6.6.4 Rock in Unlined Tunnels: Q-System Checks and Rock Support

Inspection, assessment, repair and clearance improvement of existing railroad tunnels and their portals.
Author: Daniel P. Colwell
6.6.4 Rock in Unlined Tunnels: Q-System Checks and Rock Support

The Q-system of Barton, Lien and Lunde [S5], updated by Grimstad and Barton [S6], rates rock mass quality for underground openings and links it to support needs:

Eq. 6.6-1: Q = (RQD / Jn) · (Jr / Ja) · (Jw / SRF), where RQD = rock quality designation (%), Jn = joint set number, Jr = joint roughness number, Ja = joint alteration number, Jw = joint water reduction factor and SRF = stress reduction factor. The three ratios represent block size, inter-block shear strength and active stress.

The opening size is expressed as an equivalent dimension, the span divided by the excavation support ratio ESR. ESR reflects how much safety the use of the opening demands; for major road and railway tunnels ESR is about 1.0 [S6].

Eq. 6.6-2: Maximum unsupported span = 2 · ESR · Q0.4 (m).

Eq. 6.6-3: Rock bolt length L = 2 + 0.15 B / ESR (m), where B = span (m). Empirical equations reference: RK-02, TN-02.

The support category (spot bolting, systematic bolting, bolts with shotcrete, fibre-reinforced shotcrete with bolts, ribs) is read from the Q-support chart using Q and B/ESR [S6]. Rock mass classification and the Hoek-Brown criterion are covered in Chapter 2.7, Section 2.7.17, and geologic structures in rock (faults, shear zones) in Section 2.7.19.

Example 6.6-1: Does an Unlined Rock Tunnel Section Need Support?

Problem Statement

A Class I railroad located in Virginia has a 1,200-ft unlined single-track tunnel in jointed sandstone. Recent rockfall onto the track came from a section where a clay-filled fault crosses the tunnel. The engineer mapped the rock in the typical section and in the fault zone and must decide whether either needs rock support and how long the bolts should be.

ballast B = 18 ft Fault zone(clay gouge) Typical rock Given Typical rock: RQD 60,Jn 9, Jr 1.5, Ja 2.0,Jw 1.0, SRF 1.0 Fault zone: RQD 30,Jn 12, Jr 1.0, Ja 6.0,Jw 0.66, SRF 2.5 ESR = 1.0 (railway tunnel) Required(a) Q for each zone(b) Max. unsupported span(c) Rock bolt length
Figure 6.6-1. Example 6.6-1: unlined single-track rock tunnel with a fault zone crossing it.

Given

VariableValueDescription
B18 ft (5.49 m)Tunnel span
Typical rockRQD 60; Jn 9; Jr 1.5; Ja 2.0; Jw 1.0; SRF 1.0Three joint sets, rough planar joints, slightly altered walls, dry
Fault zoneRQD 30; Jn 12; Jr 1.0; Ja 6.0; Jw 0.66; SRF 2.5Crushed rock with clay gouge, medium inflow, a single weakness zone
ESR1.0Excavation support ratio for a railway tunnel

Required

  • (a) Q for the typical rock and for the fault zone
  • (b) Maximum unsupported span for each
  • (c) Rock bolt length, and the support approach

Equations

  1. Eq. 6.6-1: Q = (RQD/Jn)(Jr/Ja)(Jw/SRF)
  2. Eq. 6.6-2: spanmax = 2 · ESR · Q0.4 (m)
  3. Eq. 6.6-3: L = 2 + 0.15 B / ESR (m)

Steps

Step 1 · (a) Q, typical rock
(60/9)(1.5/2.0)(1.0/1.0) = 6.67 × 0.75 × 1.0
Q = 5.0 (fair rock)
↓
Step 2 · (a) Q, fault zone
(30/12)(1.0/6.0)(0.66/2.5) = 2.5 × 0.167 × 0.264
Q = 0.11 (very poor rock)
↓
Step 3 · (b) Unsupported span
Typical: 5.00.4 = e0.4 × 1.609 = 1.904; 2 × 1.0 × 1.904 = 3.81 m. Fault: 0.110.4 = e0.4 × (−2.207) = 0.414; 2 × 0.414 = 0.83 m
12.5 ft (typical); 2.7 ft (fault zone), both less than the 18-ft span
Spot check: 3.81 m × 3.281 = 12.5 ft; 0.83 m × 3.281 = 2.7 ft.
↓
Step 4 · (c) Bolt length
2 + 0.15 × 5.49 / 1.0 = 2.82 m
L ≈ 9.3 ft (use 10-ft bolts)
↓
Solution
Q = 5.0 and 0.11; unsupported spans of 12.5 ft and 2.7 ft are less than the 18-ft span, so both sections need support. Bolts about 10 ft long; heavier support through the fault zone.

Solution

Q = 5.0 and 0.11; unsupported spans of 12.5 ft and 2.7 ft are less than the 18-ft span, so both sections need support. Bolts about 10 ft long; heavier support through the fault zone.

Neither zone can stand unsupported across 18 ft in the long term, which is consistent with the falls reported. In the typical rock, systematic rock bolting with spacing read from the Q-support chart, plus scaling, is the normal answer; spot bolting may suffice where mapping shows blocks are few. Through the fault zone and for about one tunnel width either side of it, the chart calls for much heavier support: fibre-reinforced shotcrete with systematic bolting, or steel ribs where the gouge is wide and squeezing. Drain the fault before shotcreting, because Jw = 0.66 shows water is entering through it. Q values depend strongly on the Ja and SRF chosen for the gouge, so map the fault zone carefully and check the result against the rockfall history.

Method: Barton, Lien and Lunde (1974); Grimstad and Barton (1993). See [S5], [S6].

Open the Q-system rock support calculator →

For railroad work: In operating tunnels, scaling and bolting are done in short track windows from a work platform, so design the support pattern to be installed in stages. Keep a log of falls with their locations; repeated falls from the same place show where the Q-system check and support are most needed.