6.6.9 Repair and Rehabilitation Methods

Inspection, assessment, repair and clearance improvement of existing railroad tunnels and their portals.
Author: Daniel P. Colwell
6.6.9 Repair and Rehabilitation Methods
Table 6.6-4. Repair and rehabilitation methods for railroad tunnels
ProblemMethodsNotes
Loose rock in unlined sectionsScaling; spot or systematic rock bolts; wire mesh; shotcreteDesign from mapping and the Q-system check (Section 6.6.4). Test bolts in place (Chapter 6.3, Section 6.3.7).
Spalling and delamination of concreteRemove loose material; patch with repair mortar or shotcrete; mesh or netting as interim protectionFind and fix the water source first.
Lost mortar and loose masonryRepointing; replacing units; stitching or anchoring ringsUse mortar compatible with the original (often lime-based).
Voids behind the liningContact grouting through drilled holes, starting low and working upControl grout pressure to avoid damaging the lining; provide drainage.
Water inflowChemical or cementitious grouting of leaks; drainage behind the lining; channels and drain pipes on the lining surfaceNever seal without a drainage path.
Deteriorated or under-strength liningShotcrete overlay (plain, mesh or fibre-reinforced); steel ribs or arches; new cast or precast liningCheck clearance first; an overlay reduces it.
Floor heaveRestore drainage; structural invert slab; rock bolts in the invertSee Section 6.6.5.
Portal instabilitySlope stabilization; portal extension or canopy; rockfall protectionSee Section 6.6.6.

Repairs in an operating tunnel are done in short windows, often at night, and must leave the track safe for traffic at the end of each shift. Materials and methods that can be installed in stages, and that cure quickly, are preferred. Ventilation and dust control are needed for shotcrete and grouting.

For railroad work: Repairs that reduce clearance (shotcrete overlays, ribs, new linings) must be checked against the clearance envelope before design is finished, using the laser-scan profile. Record each repair by station in the tunnel file so later inspections can tell repair from original lining.