↑ Parent Menu⌂ Main Menu
← Chapter 6.6 Tunnels and Portals
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · open a dropdown to go to a section or subsection

6.6.6 Portals

Inspection, assessment, repair and clearance improvement of existing railroad tunnels and their portals.
Author: Daniel P. Colwell
6.6.6 Portals

Portals are where most tunnel incidents start. The rock and soil above a portal are usually weathered and loosened, the cut slopes were steepened to shorten the tunnel, and freeze-thaw and runoff are concentrated there. Typical problems are:

  • rockfall and raveling from the portal face and the cut slopes either side;
  • slope instability above the portal, which can load or move the portal structure (diagonal cracking in the portal lining is a sign);
  • debris flows, snow avalanches and icefalls in mountain terrain;
  • deterioration of masonry and concrete portal faces and wing walls from freeze-thaw and water.

Common measures are scaling and bolting of the portal face, draped mesh or rockfall barriers, catchment ditches, drainage of the slope above, and portal extensions (canopies or rock sheds) that carry falling rock and snow over the track. Rock cut design and stabilization are covered in Chapter 6.3, Section 6.3.7, and the rockfall hazard rating for cuts in Section 3.8.29.

For railroad work: Rate each portal and its approach cuts with the rockfall hazard rating of Section 3.8.29 and include the slope above the portal in the slope inventory. After heavy rain, snowmelt or an earthquake, inspect the portals before the first train. Treat new diagonal cracks in a portal or movement of the portal face as a slope problem until shown otherwise.

← Previous · 6.0 Analysis Chapter 6.5 — Seismic Hazard and Liquefaction
Next · 7.0 Design → Chapter 7.1 — Retaining Structures