↑ Parent Menu⌂ Main Menu
← Chapter 6.4 Infiltration and Seepage
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · open a dropdown to go to a section or subsection

6.4.11 Rainfall, Matric Suction and Shallow Slope Failure

How rainfall and water move into and through railroad fills, slopes and subgrade, how that is measured, and what it does to stability.
Author: Daniel P. Colwell
6.4.11 Rainfall, Matric Suction and Shallow Slope Failure

Many cut and fill slopes along track stand steeper than their friction angle for years and then slide in a wet season. The extra strength comes from matric suction in the soil above the water table, and steady infiltration takes it away. Lu and Likos's Unsaturated Soil Mechanics gives closed-form tools for this. Their Chapter 7 derives the steady suction profile above the water table for a given infiltration or evaporation rate, using Gardner's exponential conductivity function. Their Section 8.2 takes the effective degree of saturation from the van Genuchten water retention curve as Bishop's effective stress parameter χ. Suction then adds a stress Se(ua − uw) to the normal stress on a potential slip plane. Dropping that into the infinite slope equation shows how a slope that is safe in dry weather can fail under steady rain without the water table ever reaching the slip surface.

6.4.11.1 Method

Equation 6.4-7. Steady suction profile, effective saturation and factor of safety

ψ(z) = −(1/α) ln[(1 − q/ks) e−αz + q/ks]  (z above the water table; q infiltration, positive downward)

Se = [1 + (αψ)n]−(1 − 1/n);   suction stress = Seγwψ
F = [c′ + (γd cos²β + Seγwψ) tanφ′] / (γd sinβ cosβ);  d = slip depth

Table 6.4-10. Representative hydraulic parameters (Lu and Likos, Table 7.1)
Soilnα (1/kPa)α (1/ft of head)ks (m/s)
Sand4 to 8.50.1 to 0.50.3 to 1.510−2 to 10−5
Silt2 to 40.01 to 0.10.03 to 0.310−6 to 10−9
Clay1.1 to 2.50.001 to 0.010.003 to 0.0310−8 to 10−13

α in 1/ft of suction head = α in 1/kPa × 2.99. Lu and Likos's representative infiltration rate is about 2.7 mm/day (0.11 in./day) and evaporation 1 mm/day.

With no flow the suction equals the height above the water table, which is the hydrostatic case. The solution also has a physical limit: steady infiltration cannot exceed ks, and when it reaches ks the suction falls to zero throughout. As a check, Lu and Likos's representative clay (ks = 0.014 ft/day, or 5 × 10−8 m/s; α = 0.015 per ft of suction head, or 0.005 kPa−1) under their highest infiltration rate gives about 650 psf (31 kPa) of suction 33 ft (10 m) above the water table, against 2,050 psf (98 kPa) with no flow. That is a change of roughly 1,360 psf (65 kPa), consistent with the “about 60 kPa” (1,250 psf) they describe for that case.

6.4.11.2 Worked example

A 1.5H:1V (33.7°) silt slope with φ′ = 32°, no cohesion and the water table 15 ft down is checked at a slip depth of 4 ft. Without suction its factor of safety would be 0.94, so it should not stand. With no flow, suction raises it to 2.88. Steady infiltration of 0.1 in./day lowers that to 2.27, and 0.25 in./day to 1.39. Once infiltration matches the silt's conductivity, the slope is back to 0.94 and fails. Drainage cannot help here because there is no water table at the slip depth. What helps is limiting infiltration (ditches above the crest, sealing cracks, vegetation) or flattening the slope.

Suction is real strength, but it is weather-dependent. Use it to explain why a slope has stood, never to justify a slope steeper than φ′ for design. Check the case with suction removed, and with the water table at its wet-season level, before relying on any steep cut or fill along track.

Open the rainfall and suction calculator →
Steady suction and effective saturation profiles above the water table for a given infiltration or evaporation rate, and the infinite-slope factor of safety with depth, with and without suction.

6.4.11.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • N. Lu and W.J. Likos, Unsaturated Soil Mechanics: Chapter 7, steady suction profiles (Eqs. 7.4 and 7.5), van Genuchten effective saturation (Eq. 7.11), the effective stress parameter (Eqs. 7.15 and 7.16), and Tables 7.1 and 7.2Find source ↗
  • J.M. Duncan, S.G. Wright and T.L. Brandon, Soil Strength and Slope Stability, 2nd edition: infinite slope analysis and shallow slidesFind source ↗
  • B.M. Das, Principles of Geotechnical Engineering, 7th edition: effective stress in partially saturated soilFind source ↗
← Previous · 6.0 Analysis Chapter 6.3 — Slope Stability Analysis
Next · 6.0 Analysis → Chapter 6.5 — Seismic Hazard and Liquefaction