6.4.12 Seasonal Pore Pressure in Clay-Fill Embankments

How rainfall and water move into and through railroad fills, slopes and subgrade, how that is measured, and what it does to stability.
Author: Daniel P. Colwell
6.4.12 Seasonal Pore Pressure in Clay-Fill Embankments

Section 6.4.11 treats suction above a water table under steady infiltration. Old clay embankments add a seasonal cycle: in summer, vegetation dries the fill and suctions develop; in winter the fill wets up and pore pressure can become positive at depth. Monitoring and modelling of UK railway embankments show that pore pressure in these fills is seldom hydrostatic below a thin near-surface layer, and that the steady-state, saturated assumption usually made in embankment assessments is unreliable (O'Brien, 2013, pp. 19, 29–30).

Permeability controls the winter peak

Table 6.4-11. Measured permeability of dumped clay fill (saturated values)
Zone and testk (m/s)k (ft/day)
Clay fill below about 6.5 ft (2 m), variable-head borehole tests2 × 10−9 to 5 × 10−80.0006 to 0.014
Fill affected by silt and sand lenses10−7 to 5 × 10−60.03 to 1.4
Slope surface, Guelph permeameter (near field saturation)10−6 to 10−50.3 to 2.8

O'Brien (2013), Fig. 11 and p. 25. The borehole values are one to two orders of magnitude higher than for intact stiff fissured clay because of the clod–matrix fabric.

Three zones control the pore pressure: the near-surface fill, which is cracked and more permeable; the main body of clay fill; and the foundation soil. Modelling gave a critical intermediate range of fill permeability of about 5 × 10−8 to 5 × 10−7 m/s (0.014 to 0.14 ft/day): in that range most daily winter rainfall infiltrates and pore pressure rises quickly, so a run of moderately wet days can produce a higher winter pore pressure than one storm. Fill of about 10−9 m/s (0.0003 ft/day) or less responded too slowly to be at risk (O'Brien, 2013, pp. 25, 27). Small, steep embankments developed lower pore pressures than larger, flatter ones in the same models.

Equations for unsaturated flow and strength

Equation 6.4-8. Relative hydraulic conductivity (Mualem–van Genuchten)

k(Se) = ks Se0.5 [1 − (1 − Se1/m)m]2,   m = 1 − 1/n,   Se from Equation 6.4-7

van Genuchten (1980). The UK embankment models fitted van Genuchten parameters to a modified Croney water retention curve with a lower air-entry value, to represent the clod–matrix fill (O'Brien, 2013, Appendix).

Equation 6.4-9. Shear strength of unsaturated soil (extended Mohr–Coulomb)

τ = c′ + (σ − ua) tanφ′ + (ua − uw) tanφb

Fredlund, Morgenstern and Widger (1978). φb is the friction angle for suction; the Bishop form used in Section 6.4.11 is the special case tanφb = Se tanφ′.

Two cautions from the same work. Conductivity is lower on wetting than on drying at the same suction (hysteresis), which changes how fast a slope wets up; and reliable field values of unsaturated permeability for dumped fills are scarce, so modelled pore pressures are a guide to patterns, not predictions.

A few standpipe piezometers read for a few months will not find the winter peak in a clay embankment. Read pore pressure and suction through at least one full dry and wet season (Chapter 5.3, Section 5.3.20), and use the wettest period on record, not the monitoring period, when choosing design pore pressures.

Open the rainfall and suction calculator →
Steady suction profile, effective saturation and infinite-slope factor of safety with depth, now with an optional root cohesion zone.

Sources

Paraphrased from the published sources below; values are converted to English units. Individual railroads, clients and projects are not named.

  • O'Brien, A. S. (2013). The assessment of old railway embankments – time for a change? In Gallipoli (ed.), Partial Saturation in Compacted Soils, pp. 19–32. ICE PublishingFind source ↗
  • van Genuchten, M. T. (1980). A closed-form equation for predicting the hydraulic conductivity of unsaturated soils. Soil Sci. Soc. Am. J. 44, 892–898Find source ↗
  • Fredlund, D. G., Morgenstern, N. R. and Widger, R. A. (1978). The shear strength of unsaturated soils. Can. Geotech. J. 15(3), 313–321Find source ↗