Most railroad fills and cuts that fail do so during or after wet weather: water ponds against a fill above a plugged culvert, a wetting front advances into a dry clay slope and destroys its suction, or seepage at the toe carries fines out of the embankment. Analysis therefore has to answer three questions: how fast does water get in, where does it go, and what does it do to the forces that hold the ground in place.
| Problem | Mechanism | Section |
|---|---|---|
| Rain on a dry or partly saturated slope | Wetting front; loss of suction; perched water | 6.4.1 and 6.4.2 |
| Water ponded against a fill | Steady seepage through the fill; seepage force at the toe | 6.4.3 |
| Fines leaving the toe or a culvert joint | Internal erosion and piping | 6.4.4 |
| River or reservoir drawdown | Rapid drawdown pore pressure | 6.4.5 |
| Infiltration systems and drainage | Field permeability; drain capacity | 6.4.6 and 6.4.7 |