Rain that reaches the ground either infiltrates or runs off. While the rainfall rate is below the soil's infiltration capacity, all of it enters; once it exceeds it, the excess runs off or ponds. Infiltration capacity falls with time as the near-surface soil saturates, toward a long-term rate close to the saturated hydraulic conductivity. The water moves down as a wetting front: above the front the soil is near saturation, below it the soil keeps its original moisture.
Equation 6.4-1. Green-Ampt infiltration rate
where f is the infiltration rate, Ks the saturated hydraulic conductivity, ψf the suction at the wetting front, Δθ the change in volumetric water content, and F the cumulative infiltration depth.
Two consequences matter on the railroad. First, a long, moderate rain does more damage to a clay slope than a short, intense one, because more of it gets in; antecedent rainfall is therefore part of the trigger (Section 3.8.12). Second, a wetting front reaching a less permeable layer (a clay core, rock, an old frozen zone) builds perched water above it, often along exactly the surface where the slope fails.