Drainage is usually the cheapest and most effective way to reduce the frequency of failure, because it acts directly on the trigger (Table 3.8-79). It only works while it is maintained.
| Measure | Acts on | Design notes |
|---|---|---|
| Ditch cleaning and regrading | Ponding at the toe; water in the ballast | Positive grade to an outlet; invert below the subgrade |
| Culvert cleaning, upsizing or replacement | Ponding against the fill | Capacity for the design storm (the 100-year event earns the most credit, Table 3.8-81); outlet protection |
| Subdrains and underdrains | Water in the subgrade and toe | Filter-compatible aggregate or geotextile; cleanouts |
| Toe drains and drainage blankets | Seepage exit at the toe | Filter criteria (Table 6.4-2) |
| Horizontal drains | Groundwater in the slope | Spacing from seepage analysis; monitor outflow |
| Surface sealing and diversion | Infiltration at the crest | Divert crest runoff away from cracks |