6.4.2 Unsaturated Soil Behavior

How rainfall and water move into and through railroad fills, slopes and subgrade, how that is measured, and what it does to stability.
Author: Daniel P. Colwell
6.4.2 Unsaturated Soil Behavior

Above the water table, fine-grained soils hold water under suction (negative pore pressure). Suction adds apparent cohesion and is why steep cuts in dry silt and clay stand for years. Wetting removes it. A slope that is stable in a dry season can fail after rain with no rise in the water table at all, simply because the suction it depended on has gone.

Equation 6.4-2. Shear strength of unsaturated soil (extended Mohr-Coulomb)

τ = c′ + (σ − ua) tan φ′ + (ua − uw) tan φb

where (ua − uw) is matric suction and φb the angle describing the strength gained from suction.

Design practice. Do not rely on suction for long-term stability of railroad slopes. Use it to explain why a slope has stood and why it failed after a wet period, and check stability with the suction removed (Chapter 6.3).