↑ Parent Menu⌂ Main Menu
← Chapter 6.4 Infiltration and Seepage
GHRM
Railway Ground Hazard Risk Management · 6.0 · Analysis
Sections · open a dropdown to go to a section or subsection

6.4.9 Apps and Analytical Tools 10

How rainfall and water move into and through railroad fills, slopes and subgrade, how that is measured, and what it does to stability.
Author: Daniel P. Colwell
6.4.9 Apps and Analytical Tools10

The web apps and the Geotechnical Analysis Suite calculators and workbook guides for this part of the analysis, gathered here from across the manual in the November 2026 restructure: 10 tools (3 interactive calculators). Where a tool applies to a particular section of this chapter it is also placed in that section in an orange tools strip. Each row lists the chapters and sections where the tool is used. Calculators open on dirtbert.com (sign-in required).

Apps

Each app runs in a web browser on a desktop or a phone, with nothing to install. How to use the apps (1.0.3).

Tools

Groundwater & Seepage
GWFalling Head Tube CalibrationsUsed in Chapter 2.8, 2.8.4 Field Permeability Testingguide onlyGuide
GWFlexible Wall PermeabilityUsed in Chapter 5.2, 5.2.3 Test Methods — ASTM Standards and English Unit Outputsguide onlyGuide
GWInfiltration Calculations & ProcedureUsed in Chapter 3.8, 3.8.12 Rainfall Thresholds and Weather-Based Operating Protocols; Chapter 2.8, 2.8.4 Field Permeability TestingCalculator ▸Guide
GWSeepage Through Dam (Kozeny)Used in Chapter 2.8, 2.8.5 Seepage Analysisguide onlyGuide
GWSlug Test — Bouwer–RiceUsed in Chapter 2.8, 2.8.4 Field Permeability Testingguide onlyGuide
GWSlug Test — HvorslevUsed in Chapter 2.8, 2.8.4 Field Permeability Testingguide onlyGuide
GWUnderseepageUsed in Chapter 3.8, 3.8.4 Hydraulic Failure Mechanisms; Chapter 2.8, Applies to the chapter as a wholeguide onlyGuide
GWWell Construction Summary (BRLF)Used in Chapter 2.8, 2.8.3 Piezometers — Types, Installation, and Monitoringguide onlyGuide
Pavements, Subgrade & Frost
PVCulvert TableoldUsed in Chapter 2.1, 2.1.5 Drainage ElementsCalculator ▸Guide
PVHDPE Pipe DesignUsed in Chapter 2.1, 2.1.9 Utility and Pipeline CrossingsCalculator ▸Guide

Calculator: Ballast Fouling and Drainage (Section 6.4.10)

Calculator: Rainfall, Suction and Shallow Slides (Section 6.4.11)

← Previous · 6.0 Analysis Chapter 6.3 — Slope Stability Analysis
Next · 6.0 Analysis → Chapter 6.5 — Seismic Hazard and Liquefaction