When the upward exit gradient at the toe approaches the critical gradient, the effective stress in the soil goes to zero and particles can be carried out. Once a pipe starts it concentrates flow and grows backward toward the water. Culvert joints that have separated, animal burrows and old timber structures in a fill give water the same short cut.
Equation 6.4-4. Critical hydraulic gradient
| Requirement | Criterion | Purpose |
|---|---|---|
| Retention | D15 filter / D85 soil ≤ 4 to 5 | Keep soil particles from passing through the filter |
| Permeability | D15 filter / D15 soil ≥ 4 to 5 | Filter much more permeable than the soil |
| Uniformity and segregation | Well-graded filter, placed without segregation | Consistent performance |
| Geotextiles | Apparent opening size and permittivity chosen for the soil | Where granular filters are impractical |
