Slope stability analysis (Chapter 6.3) needs the pore pressure on the slip surface. Three ways of describing it are in common use: a phreatic surface (from readings or a seepage model), a pore pressure ratio ru = u / (γz), and a full seepage analysis. Railroad cases that need particular care are listed below.
| Case | Approach |
|---|---|
| Perched water on a clay or rock contact after rain | Phreatic surface on the contact; check with the suction removed |
| Water ponded against a fill (blocked culvert) | Steady seepage at the ponded level; this is the trigger condition for drainage-driven sites |
| Rapid drawdown after a flood | Drawdown analysis; low-permeability fill keeps its high pore pressure while the support of the water outside is removed |
| Artesian pressure under a clay toe | Piezometers; uplift on the base of the clay |
| Live conditions | The live rating (Section 3.8.26) raises the frequency index when rainfall or stage passes the site's threshold |