↑ Parent Menu⌂ Main Menu
← Appendix D Typical Soil Properties
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

D.10 Cross-References

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.10 Cross-References
TopicRefer To
SPT procedure and correctionsChapter 4.1, Section 4.1.3
In situ testing (CPTu, vane, pressuremeter, MASW)Chapter 5.1
Soil classification (USCS, AASHTO)Chapter 2.2, Section 2.2.4
Laboratory test methodsChapter 5.2, Section 5.2.3
Consolidation settlementChapter 6.2, Section 6.2.4
Residual and fully softened strengthChapter 6.3, Section 6.3.6
Liquefaction of sands and siltsChapter 6.5, Section 6.5.5
Pavement and track subgrade valuesChapter 7.3, Section 7.3.2
Silts: typical values and behaviorChapter 2.4
Analytical equationsAppendix F
← Previous · Appendices Appendices
Next · Appendices → Appendix F — Analytical Equations