D.7 Where the Values Came From and Their Limitations

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.7 Where the Values Came From and Their Limitations
Table D-13: Sources of the Typical Values
TopicPrimary sourcesBasis of the data
SPT corrections and density termsTerzaghi and Peck (1948, 1967); Skempton (1986); Youd et al. (2001)Field and laboratory comparisons, mostly in clean quartz sands
Friction angle of sands from NPeck, Hanson and Thornburn (1974); Schmertmann (1975); Kulhawy and Mayne (1990); Hatanaka and Uchida (1996)Back-calculation and triaxial tests on reconstituted and frozen samples
Unit weights and moistureNAVFAC DM-7.01 (1986); phase relationships (Eq. D-11)Compilations of laboratory data from U.S. projects
Consistency and su of clays from NTerzaghi and Peck (1967); Stroud (1974)Comparison of SPT with unconfined and triaxial tests; Stroud's data are from UK overconsolidated clays
su from stress history and PISkempton (1957); Ladd and Foott (1974); Mesri (1975); Ladd (1991)Field vane and laboratory tests on normally and lightly overconsolidated clays
Friction angle of clays from PIBjerrum and Simons (1960); Stark and Eid (1994, 1997)Triaxial and ring shear tests
Liquidity index and remolded strengthWroth and Wood (1978); Mitchell and Soga (2005)Fall-cone and vane tests on remolded soils
CompressibilityTerzaghi and Peck (1967); Hough (1957); Koppula (1981); Mesri and Godlewski (1977)Oedometer test databases
Modulus and subgrade reactionBowles (1996); Duncan and Buchignani (1976); Terzaghi (1955)Plate load, pressuremeter and laboratory data
Organic soils and peatMesri and Ajlouni (2007); Edil and den Haan (1994)Field and oedometer data from peat and organic deposits
PermeabilityUSACE EM 1110-2-1901; Holtz, Kovacs and Sheahan (2011)Laboratory and field test compilations

General limitations

  • Typical, not site-specific. The ranges describe common soils. Any one site can fall outside them, and the ranges overlap so that a single number cannot be read with precision.
  • Correlations carry large scatter. Most N-based correlations predict the measured property within about ±30% to ±50% at best; the su–N relationship scatters by a factor of two.
  • Developed on specific soils. Most correlations come from uncemented quartz sands and inorganic, unstructured clays of temperate regions. They do not apply reliably to residual soils and saprolite, cemented or calcareous soils, sensitive or quick clays, fissured clays, collapsible loess, expansive clays, glacial till with cobbles, or fill.
  • Field procedure matters. Hammer type, borehole stabilization and sampler condition change N by 50% or more. Uncorrected or poorly logged blow counts cannot be converted reliably.
  • Drainage and loading conditions. The tables give one value per parameter. Design needs the parameter for the right drainage state (drained, undrained, fully softened, residual) and the right strain level and loading rate.
  • Not for final design of critical elements. Do not use these values alone for final design of embankments on soft ground, slope repairs, retaining walls, bridge foundations or liquefaction mitigation.
  • No client data. The values are from published sources only and contain no client- or project-specific data.