↑ Parent Menu⌂ Main Menu
← Appendix D Typical Soil Properties
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

D.0 How to Use This Appendix

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.0 How to Use This Appendix

Every boring produces three numbers long before the laboratory program is finished: the Standard Penetration Test blow count (N), the natural moisture content (w) and, for fine-grained soils, the liquid limit (LL) and plastic limit (PL). This appendix turns those numbers into typical engineering properties for each soil type, so a preliminary analysis can start the day the boring logs arrive.

Use it in this order:

  1. Classify the soil (USCS group, Chapter 2.2, Section 2.2.4). Coarse-grained soils use Section D.2; fine-grained soils use Sections D.3 and D.4; silts also see Chapter 2.4; organic soils use Section D.5.
  2. Correct the blow count to N60 and, for sands, to (N1)60 (Section D.1).
  3. Read the consistency or density term and the property ranges from the tables.
  4. Check the moisture content against the Atterberg limits (liquidity index, Section D.4). Where the blow count and the moisture content point to different consistencies, use the weaker value and flag it for testing.
  5. Record the source printed under each table, and list the follow-up tests needed to replace the typical value (Section D.8).
Every value in this appendix is a typical value from published correlations, not a test result. State in calculations and reports that a parameter was "estimated from Appendix D, Table D-x," and replace it with site test data before final design. Section D.7 lists the general limitations; each table also has its own.

All values are in English units: unit weight in pcf, stress and strength in psf (or ksf), modulus in ksf, permeability in ft/day.

← Previous · Appendices Appendices
Next · Appendices → Appendix F — Analytical Equations