↑ Parent Menu⌂ Main Menu
← Appendix D Typical Soil Properties
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

D.5 Organic Soils and Peat

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.5 Organic Soils and Peat
Table D-11: Typical Properties of Organic Soils and Peat
PropertyOrganic silt / clay (OL, OH)Peat (PT)
Organic content (ASTM D2974, %)5–30> 50
N60 (blows/ft)0–50–2 (often weight of hammer)
Natural moisture, w (%)40–150200–1,500
Bulk unit weight, γ (pcf)85–10560–75
Specific gravity, Gs2.30–2.651.4–2.0
Undrained strength, su (psf)100–600100–400 (fibrous peat: use effective-stress methods)
Cc/(1 + e0)0.15–0.350.30–0.60
Cα/Cc0.04–0.060.05–0.07
Typical correlationCc ≈ 0.0115 wn (organic soils, wn in %)Cc ≈ 0.01 wn; secondary compression governs long-term settlement

Source: Mesri and Ajlouni (2007); Mesri, Stark, Ajlouni and Chen (1997); Edil and den Haan (1994); Holtz, Kovacs and Sheahan (2011).

Limitations. Peat and organic soils are highly variable over short distances; one boring is not representative of a reach. SPT blow counts are meaningless in peat. Strength and compressibility change with drainage and oxidation over time, and gas affects unit weight.

Follow-up testing: Continuous sampling or probing to define the extent and thickness; organic content and ash content (ASTM D2974); consolidation tests with long secondary-compression stages; field vane or CPTu for strength; settlement plates and piezometers during fill placement (Chapter 5.3).

← Previous · Appendices Appendices
Next · Appendices → Appendix F — Analytical Equations