Carter and Bentley's Soil Properties and their Correlations and Look's Handbook of Geotechnical Investigation and Design Tables collect the correlations used when the only data are blow counts and index tests. The calculator applies the standard corrections and then the most widely used correlations, showing more than one where they disagree, so the user sees the spread rather than a single number. Section D.8 explains which follow-up tests replace these values for design.
Equation D-1. Corrected blow counts
| Property | Correlation | Soil |
|---|---|---|
| Relative density | Dr ≈ [(N1)60/60]0.5 (Skempton) | Sand |
| Friction angle | φ' = √(15.4(N1)60) + 20 (Hatanaka and Uchida, GEC 5 form); φ' = 27.1 + 0.3(N1)60 − 0.00054(N1)60² (Peck et al.) | Sand |
| Drained modulus | Es/Pa ≈ 10 N60 clean NC sand (5 silty, 15 OC) | Sand |
| Undrained strength | su = f1N60, f1 about 135 psf (6.5 kPa) at PI 15 to 92 psf (4.4 kPa) at PI ≥ 40 (Stroud) | Clay |
| Compression index | 0.009(LL − 10); 0.01(LL − 13); 0.012 wn (EM 1110-1-1904) | Clay |
| Sample | Data | Results |
|---|---|---|
| Sand at 12 ft, water at 6 ft | N = 14, ER 80% | N60 15.9; (N1)60 22.1; medium dense; φ' 33.5 deg to 38.4 deg; Es about 336 ksf |
| Clay at 12 ft, PI 25, LL 45, w 30% | N = 9, ER 80% | N60 10.2; stiff; su about 1,206 psf; Cc 0.32 to 0.36 |
Open the SPT correlations calculator →
SPT energy, rod, borehole, sampler and overburden corrections, then relative density, friction angle, modulus, undrained strength and compression index estimates.
These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.