↑ Parent Menu⌂ Main Menu
← Appendix D Typical Soil Properties
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

D.6 Quick-Reference Table by Soil Type

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.6 Quick-Reference Table by Soil Type

One line per common soil type and condition. Use it for the first pass of a boring log; refine with the detailed tables above.

Table D-12: Quick-Reference Typical Values
Soil (USCS) and conditionN60w (%)LLγ (pcf)φ′ (deg)c′ or su (psf)Es (ksf)k (ft/day)Soaked CBR
GW/GP, dense30–50+3–8NP130–14038–4401,500–4,00030–3,00040–80
GM/GC, medium dense15–356–15NP–35125–13533–380–200800–2,0000.003–320–40
SW/SP, loose5–103–15NP95–11029–310200–5003–30010–20
SW/SP, medium dense11–303–12NP105–12031–360500–1,0003–30015–30
SM, medium dense11–308–20NP–30110–12529–340300–8000.03–310–20
SC, medium dense11–3010–2025–40115–12827–32c′ 0–200300–7000.0003–0.035–15
ML, loose / soft2–820–3525–45110–12027–31c′ 040–900.003–33–6
ML, medium dense / stiff9–2015–2525–45115–12530–34c′ 0–10090–1600.003–0.35–10
CL, soft2–430–4030–50105–11528–32su 250–50050–1500.0003–0.032–4
CL, stiff9–1518–2830–50120–12828–32su 1,000–2,000300–6000.0003–0.034–8
CL, very stiff to hard16–4012–2030–50125–13528–32su 2,000–6,000600–1,8000.0003–0.036–12
MH, firm4–1035–5550–8095–11026–31su 400–1,00040–1500.0003–0.032–6
CH, soft2–440–7050–9095–11024–29su 250–50040–1500.00003–0.0031–3
CH, stiff9–1525–4050–90110–12024–29su 1,000–2,000300–6000.00003–0.0032–5
OL/OH0–540–15035–8085–10522–30su 100–60010–600.0003–0.031–3
PT (peat)0–2200–1,500—60–75—su 100–400< 200.003–3< 1

φ′ for fine-grained soils is the peak drained value for normally consolidated material (Eq. D-7); use fully softened or residual values where Section D.3 calls for them. Es for clays is the undrained modulus. NP = non-plastic. CBR ranges after USACE and AASHTO subgrade practice; see Chapter 6.3.

Source: Compiled from Tables D-1 to D-11 and their sources; CBR from USACE EM 1110-3-138 and the Unified Facilities Criteria for pavement subgrades (UFC 3-250-01).

← Previous · Appendices Appendices
Next · Appendices → Appendix F — Analytical Equations