Subsections
13Primary References: Terzaghi and Peck (1967); Peck, Hanson and Thornburn (1974); Kulhawy and Mayne (1990), EPRI EL-6800; NAVFAC DM-7.01 (1986); Bowles (1996); Holtz, Kovacs and Sheahan (2011); Skempton (1986); Stroud (1974); Wroth and Wood (1978); ASTM D1586, D2216, D2487, D4318.
- D.0How to Use This Appendixopen →
- D.1Blow Count Corrections and Description Termsopen →
- D.2Coarse-Grained Soils (Gravels and Sands)open →
- D.3Fine-Grained Soils: Strength and Unit Weight from Blow Countsopen →
- D.4Fine-Grained Soils: Moisture Content and Atterberg Limitsopen →
- D.5Organic Soils and Peatopen →
- D.6Quick-Reference Table by Soil Typeopen →
- D.7Where the Values Came From and Their Limitationsopen →
- D.8Follow-Up Testing to Replace Typical Valuesopen →
- D.9Worked Exampleopen →
- D.10Cross-Referencesopen →
- D.11SPT Corrections and Property Correlations Calculatoropen →
- ·Author and Sourcesopen →