↑ Parent Menu⌂ Main Menu
← Appendix D Typical Soil Properties
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

D.4 Fine-Grained Soils: Moisture Content and Atterberg Limits

Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
Author: Daniel P. Colwell
D.4 Fine-Grained Soils: Moisture Content and Atterberg Limits

Moisture content and the Atterberg limits are cheap, fast and repeatable, and they are often more informative than the blow count in soft and medium fine-grained soils. Run them on every fine-grained sample.

Liquidity index

LI = w − PLLL − PL = w − PLPI

Eq. D-8

Table D-8: Consistency and Behavior from Liquidity Index
LIConditionTypical su of the remolded soil (psf, Eq. D-9)Engineering meaning
> 1.0Above the liquid limit< 35Very soft, sensitive or quick if structure is disturbed; normally consolidated or underconsolidated; expect large settlement
0.75–1.0Near the liquid limit35–110Soft; normally consolidated
0.5–0.75Upper plastic range110–360Medium stiff
0.25–0.5Mid plastic range360–1,100Stiff; often lightly overconsolidated
0–0.25Near the plastic limit1,100–3,550Very stiff; overconsolidated or desiccated
< 0Below the plastic limit> 3,550Hard; heavily overconsolidated, desiccated or cemented; check for swell
su,remolded (psf) ≈ 3,550 · e−4.6 LI

Eq. D-9 (after Wroth and Wood 1978: about 35 psf at the liquid limit and about 3,550 psf at the plastic limit)

Source: Liquidity index: ASTM D4318 definitions; behavior after Terzaghi, Peck and Mesri (1996) and Mitchell and Soga (2005). Eq. D-9 gives remolded strength; undisturbed strength of structured or overconsolidated clay can be several times higher.

Compressibility from moisture content and liquid limit

Cc ≈ 0.009 (LL − 10)     Cc ≈ 0.01 wn     Cr ≈ Cc/5 to Cc/10     Cα ≈ 0.04 Cc

Eq. D-10 (Terzaghi and Peck 1967; Koppula 1981; Mesri and Godlewski 1977; wn in %)

Table D-9: Typical Compressibility of Fine-Grained Soils by Moisture Content and Liquid Limit
USCS groupTypical LLTypical wn below water table (%)CcCrcv (ft2/day)Typical k (ft/day)
ML25–4515–350.10–0.300.01–0.050.5–200.003–3
CL25–5015–400.15–0.400.02–0.060.1–20.0003–0.03
MH50–8030–600.30–0.800.03–0.100.05–20.0003–0.03
CH50–10030–700.40–1.00.05–0.150.01–0.50.00003–0.003
OL / OH35–8040–1500.40–1.50.05–0.200.02–10.0003–0.03

Ranges compiled from Holtz, Kovacs and Sheahan (2011), Terzaghi, Peck and Mesri (1996) and NAVFAC DM-7.01 (1986).

Unit weight and void ratio from moisture content

Below the water table a fine-grained soil is saturated, so its moisture content fixes its void ratio and unit weight:

e = w Gs     γsat = Gs γw (1 + w)1 + w Gs     γd = Gs γw1 + w Gs

Eq. D-11 (S = 100%; γw = 62.4 pcf)

Table D-10: Saturated Unit Weight from Moisture Content (Gs = 2.70)
w (%)1520253040506080100
Void ratio, e0.410.540.680.811.081.351.622.162.70
γsat (pcf)1381311261211131081039691
γd (pcf)120109101938172645346

Computed from Eq. D-11. For each 0.1 change in Gs, γsat changes by about 1 to 3 pcf. Use Gs = 2.60 to 2.65 for soils with organic content and 2.75 to 2.80 for micaceous or iron-rich soils.

Limitations. The equations assume full saturation; above the water table, or in gassy organic soils, they overestimate unit weight. The Cc correlations carry an error of ±30% or more and do not apply to structured, sensitive or cemented clays, where Cc beyond the preconsolidation stress can be two to three times higher. Liquid limits run on oven-dried samples of organic or tropical soils can be much lower than on natural samples.

Follow-up testing: Natural moisture (ASTM D2216) on every sample; Atterberg limits (ASTM D4318, wet preparation) on each fine-grained stratum; specific gravity (ASTM D854) where unit weight governs; one-dimensional consolidation (ASTM D2435 or D4186) on tube samples under embankments and structures; organic content (ASTM D2974) where w or color suggest organics.

← Previous · Appendices Appendices
Next · Appendices → Appendix F — Analytical Equations