| Property | Very soft | Soft | Medium stiff | Stiff | Very stiff | Hard |
|---|---|---|---|---|---|---|
| N60 (blows/ft) | 0–2 | 3–4 | 5–8 | 9–15 | 16–30 | > 30 |
| Undrained strength, su (psf) | < 250 | 250–500 | 500–1,000 | 1,000–2,000 | 2,000–4,000 | > 4,000 |
| Saturated unit weight, γsat (pcf) | 95–110 | 100–115 | 110–120 | 115–125 | 120–130 | 125–135 |
| Typical natural moisture, w, in CL (%) | > 40 | 30–40 | 25–32 | 18–28 | 14–22 | < 16 |
| Typical liquidity index, LI | > 1.0 | 0.75–1.0 | 0.5–0.75 | 0.25–0.5 | 0–0.25 | < 0 |
| Young's modulus, Eu (undrained, ksf) | < 50 | 50–150 | 150–300 | 300–600 | 600–1,200 | > 1,200 |
| Coefficient of subgrade reaction, ks (pci, 1-ft plate) | — | — | < 60 | 60–115 | 115–230 | > 230 |
Source: Consistency and su: Terzaghi and Peck (1967). Unit weights: NAVFAC DM-7.01 (1986). Eu = 200 to 500 su for CL/CH (Duncan and Buchignani 1976), shown here at about 300 su. ks: Terzaghi (1955). Moisture and LI ranges are typical of inorganic lean clay and are given for cross-checking only.
Eq. D-5 (Stroud 1974; f1 about 135 psf for PI ≈ 15 and about 92 psf for PI ≥ 40, or 6.5 to 4.4 kPa)
Eq. D-6 (Skempton 1957; Mesri 1975 and Ladd 1991 SHANSEP form)
Eq. D-6 gives su of normally consolidated clay from its effective stress, which is often more reliable than the blow count in soft clay (N60 < 4), where one blow either way changes the consistency class.
Eq. D-7 (Bjerrum and Simons 1960; normally consolidated clays with PI about 10 to 80)
| PI | 10 | 20 | 30 | 40 | 60 |
|---|---|---|---|---|---|
| φ′ (deg), peak, normally consolidated | 36 | 31 | 29 | 27 | 25 |
| Typical fully softened φ′ (deg) | 30–34 | 26–31 | 23–28 | 20–26 | 17–23 |
| Typical residual φ′r (deg) | 25–30 | 18–26 | 13–20 | 10–16 | 8–13 |
Source: Peak: Bjerrum and Simons (1960). Fully softened and residual: Stark and Eid (1994, 1997) and Stark, Choi and McCone (2005), ranges for effective normal stress of 1,000 to 4,000 psf; values depend on clay-size fraction and LL. Use fully softened strength for cut slopes and compacted clay fills, and residual strength where a slide surface has formed (Chapter 6.3, Section 6.3.6).
Follow-up testing: Pocket penetrometer and torvane on every Shelby tube and split-spoon sample (screening only); unconfined compression (ASTM D2166) or UU triaxial (ASTM D2850) on tube samples; field vane (ASTM D2573) or CPTu in soft clay; CU triaxial with pore pressure (ASTM D4767) for effective-stress parameters; ring shear (ASTM D6467) or torsional ring shear for residual strength in slide repairs.