Starting values for each soil type, read from the three numbers every boring gives: the SPT blow count, the natural moisture content and the liquid limit. Each table names where its values came from, what they cannot be used for, and which tests should replace them.
The example is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example D-1: Preliminary Parameters From a Boring Log
A boring for a culvert replacement under a main-line embankment, with blow counts and index tests only. The appendix tables and correlations give preliminary design parameters, and a stress-history check tests whether they make sense together before anything is designed.
Given
Variable
Value
Description
0 to 8 ft
SP-SM; N = 12 at 6 ft; w = 9%
Water table at 8 ft
8 to 20 ft
CL; N = 4 to 6; w = 31%; LL 38; PL 19
Below 20 ft
SP; N = 38
Hammer
Automatic, Em = 85%; CB = CS = 1.0
CR
0.75 (5 to 10 ft rods); 0.85 (10 to 15 ft)
Required
N60 for the sand and clay
Preliminary φ′, su, Cc, and a check against stress history
σ′v at 14 ft = 8(115) + 6(57.6) = 1,266 psf; 0.22 × 1,266
280 psf, about one-third of 770 psf
Spot check: su/σ′v = 0.61 implies OCR of about 3.5 by Eq. D-6 (a desiccated crust or old fill), or blow counts that overstate the strength.
↓
Solution
Sand φ′ = 31°; clay su = 500 psf; Cc = 0.28.
Solution
Preliminary values: sand φ′ = 31°; clay su = 500 psf (flagged); Cc = 0.28.
The N-based strength is more than twice what a normally consolidated clay at this depth would have, so 500 psf is used and the discrepancy is flagged rather than resolved by choosing the higher number. Record the basis in the calculation package (Tables D-3, D-4, D-5, D-8 and D-10; Eqs. D-5 to D-10) and replace the values with UU triaxial, consolidation and grain-size results before final design.