Author: Daniel P. Colwell. This appendix was compiled by Daniel P. Colwell for Railway Ground Hazard Risk Management from the published sources below; credit for that material belongs to their authors and publishers. It contains no client- or project-specific data.
Sources
- Bjerrum, L. and Simons, N. E. (1960). “Comparison of Shear Strength Characteristics of Normally Consolidated Clays.” Proc. ASCE Research Conf. on Shear Strength of Cohesive SoilsFind source ↗
- Bowles, J. E. (1996). Foundation Analysis and Design, 5th ed. McGraw-HillFind source ↗
- Duncan, J. M. and Buchignani, A. L. (1976). An Engineering Manual for Settlement Studies. University of California, BerkeleyFind source ↗
- Edil, T. B. and den Haan, E. J. (1994). “Settlement of Peats and Organic Soils.” ASCE GSP 40Find source ↗
- Hatanaka, M. and Uchida, A. (1996). “Empirical Correlation between Penetration Resistance and Internal Friction Angle of Sandy Soils.” Soils and Foundations, 36(4)Find source ↗
- Holtz, R. D., Kovacs, W. D. and Sheahan, T. C. (2011). An Introduction to Geotechnical Engineering, 2nd ed. PearsonFind source ↗
- Hough, B. K. (1957). Basic Soils Engineering. Ronald PressFind source ↗
- Idriss, I. M. and Boulanger, R. W. (2008). Soil Liquefaction During Earthquakes. EERI MNO-12Find source ↗
- Koppula, S. D. (1981). “Statistical Estimation of Compression Index.” Geotechnical Testing Journal, 4(2)Find source ↗
- Kulhawy, F. H. and Mayne, P. W. (1990). Manual on Estimating Soil Properties for Foundation Design. EPRI EL-6800Find source ↗
- Ladd, C. C. (1991). “Stability Evaluation during Staged Construction.” J. Geotech. Eng., 117(4); Ladd, C. C. and Foott, R. (1974). J. Geotech. Eng. Div., 100(GT7)Find source ↗
- Liao, S. S. C. and Whitman, R. V. (1986). “Overburden Correction Factors for SPT in Sand.” J. Geotech. Eng., 112(3)Find source ↗
- Mesri, G. (1975). “Discussion of New Design Procedure for Stability of Soft Clays.” J. Geotech. Eng. Div., 101(GT4); Mesri, G. and Godlewski, P. M. (1977). “Time and Stress-Compressibility Interrelationship.” 103(GT5)Find source ↗
- Mesri, G. and Ajlouni, M. (2007). “Engineering Properties of Fibrous Peats.” J. Geotech. Geoenviron. Eng., 133(7)Find source ↗
- Mesri, G., Stark, T. D., Ajlouni, M. A. and Chen, C. S. (1997). “Secondary Compression of Peat with or without Surcharging.” J. Geotech. Geoenviron. Eng., 123(5)Find source ↗
- Mitchell, J. K. and Soga, K. (2005). Fundamentals of Soil Behavior, 3rd ed. WileyFind source ↗
- NAVFAC (1986). Design Manual 7.01: Soil Mechanics. Naval Facilities Engineering CommandFind source ↗
- Peck, R. B., Hanson, W. E. and Thornburn, T. H. (1974). Foundation Engineering, 2nd ed. Wiley; Wolff, T. F. (1989). Pile capacity prediction using parameter functions. ASCE GSP 23Find source ↗
- Schmertmann, J. H. (1975). “Measurement of In Situ Shear Strength.” Proc. ASCE Specialty Conf. on In Situ Measurement of Soil PropertiesFind source ↗
- Skempton, A. W. (1957). “The Planning and Design of the New Hong Kong Airport.” Proc. ICE, 7; Skempton, A. W. (1986). “Standard Penetration Test Procedures and the Effects in Sands of Overburden Pressure, Relative Density, Particle Size, Ageing and Overconsolidation.” Géotechnique, 36(3)Find source ↗
- Stark, T. D. and Eid, H. T. (1994, 1997). Drained residual and fully softened strengths of clays. J. Geotech. Eng., 120(5); J. Geotech. Geoenviron. Eng., 123(4); Stark, T. D., Choi, H. and McCone, S. (2005). 131(5)Find source ↗
- Stroud, M. A. (1974). “The Standard Penetration Test in Insensitive Clays and Soft Rocks.” Proc. European Symposium on Penetration TestingFind source ↗
- Terzaghi, K. (1955). “Evaluation of Coefficients of Subgrade Reaction.” Géotechnique, 5(4)Find source ↗
- Terzaghi, K. and Peck, R. B. (1948, 1967). Soil Mechanics in Engineering Practice. Wiley; Terzaghi, Peck and Mesri (1996), 3rd ed.Find source ↗
- USACE EM 1110-1-1904, Settlement Analysis; EM 1110-2-1901, Seepage Analysis and Control for Dams; EM 1110-3-138, Pavement Criteria for Seasonal Frost Conditions; UFC 3-250-01, Pavement Design for Roads and Parking AreasOfficial page ↗Library entry
- Wroth, C. P. and Wood, D. M. (1978). “The Correlation of Index Properties with Some Basic Engineering Properties of Soils.” Can. Geotech. J., 15(2)Find source ↗
- Youd, T. L. et al. (2001). J. Geotech. Geoenviron. Eng., 127(10)Find source ↗
- ASTM D1586, D2166, D2216, D2435, D2487, D2488, D2573, D2850, D2974, D3080, D4186, D4318, D4633 (withdrawn 2025), D4767, D5778, D6467, D6913, D6951, D7263, D7928; AASHTO T 307Official page ↗