For gravels and sands, the blow count controls the estimate. Moisture content has little effect on the strength of clean coarse soils, but it is needed for unit weight above the water table.
| Property | Very loose | Loose | Medium dense | Dense | Very dense |
|---|---|---|---|---|---|
| N60 (blows/ft) | 0–4 | 5–10 | 11–30 | 31–50 | > 50 |
| Friction angle, φ′ (deg) | 26–29 | 29–31 | 31–36 | 36–41 | 41–45 |
| Moist unit weight, γ (pcf) | 90–100 | 95–110 | 105–120 | 115–130 | 120–135 |
| Saturated unit weight, γsat (pcf) | 110–118 | 115–122 | 120–128 | 125–135 | 130–140 |
| Natural moisture above water table (%) | 3–15 | 3–15 | 3–12 | 3–10 | 3–10 |
| Young's modulus, Es (ksf) | 100–200 | 200–500 | 500–1,000 | 1,000–1,700 | 1,700–2,500 |
| Coefficient of subgrade reaction, ks, 1-ft plate, above / below water table (pci) | < 45 / < 30 | 45 / 30 | 150 / 95 | 580 / 350 | > 580 / > 350 |
Source: φ′: Peck, Hanson and Thornburn (1974) and NAVFAC DM-7.01 (1986). Unit weights: NAVFAC DM-7.01 and Holtz, Kovacs and Sheahan (2011). Es: Bowles (1996). ks: Terzaghi (1955) for a 1-ft square plate (his recommended 40, 130 and 500 tons/ft³ for loose, medium dense and dense sand above the water table and 25, 80 and 300 tons/ft³ submerged, converted to pci); scale to the loaded width before use. These are vertical plate values, not the p-y modulus constants used for laterally loaded piles.
| USCS group | φ′ adjustment to Table D-4 | Unit weight adjustment | Permeability, k (ft/day) | Notes |
|---|---|---|---|---|
| GW, GP (gravels) | +2° to +4° | +5 to +10 pcf | 300–3,000 (GP), 30–300 (GW) | N inflated by cobbles; discount refusal blows |
| GM, GC (silty, clayey gravel) | 0° to +2° | +5 pcf | 0.003–3 | Drainage and frost behavior controlled by fines |
| SW, SP (clean sand) | Table D-4 as given | — | 3–300 (SP fine sand 3–30) | — |
| SM (silty sand) | −2° to −4° | −0 to −5 pcf | 0.03–3 | See Chapter 2.4 for silt-controlled behavior; liquefiable when loose and saturated |
| SC (clayey sand) | −3° to −6°; c′ = 0–200 psf | — | 0.0003–0.03 | Moisture-sensitive; use D.3 for strength if fines are plastic and exceed about 30% |
Source: Holtz, Kovacs and Sheahan (2011); NAVFAC DM-7.01 (1986); USACE EM 1110-2-1901 (permeability).
Eq. D-2 (Peck, Hanson and Thornburn 1974, as fitted by Wolff 1989)
Eq. D-3 (Kulhawy and Mayne 1990; Schmertmann 1975)
Eq. D-2 uses the overburden-corrected blow count, as the Peck, Hanson and Thornburn chart does; it gives about 28° at (N1)60 = 4, 30° at 10, 33° at 20, 36° at 30 and 38° at 40. Eq. D-3 uses N60 and σ′v directly and is a useful cross-check below about 20 ft. Hatanaka and Uchida (1996), in the FHWA GEC 5 form for 60% energy, φ′ = √[15.4 (N1)60] + 20, gives higher values (about 37.5° at (N1)60 = 20; the original √(20 N1) + 20 is for Japanese SPT energy) and is calibrated on high-quality frozen samples of clean sand; cap it at 45° and do not use it for silty sands.
Eq. D-4 (after Bowles 1996, converted from kPa)
Eq. D-4 and the Es/pa ≈ 10 N60 form used by the calculator (Kulhawy and Mayne 1990) give values near the lower end of the Table D-4 ranges for medium dense and denser sand; the spread is typical of modulus correlations, and the lower value is the safer one for settlement.
Follow-up testing: Grain-size analysis (ASTM D6913) on every sample; energy measurement of the SPT hammer (ASTM D4633, withdrawn 2025); direct shear (ASTM D3080) on reconstituted samples at field density; CPTu soundings for continuous density profile; field permeability tests where drainage or dewatering governs.