↑ Parent Menu⌂ Main Menu
← Chapter 3.3 Drilling Scope
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · open a dropdown to go to a section or subsection

3.3.2 Boring Depth Criteria

Deciding where, how deep and how many borings and tests a site needs, and writing it so a driller can price it.
Author: Daniel P. Colwell
3.3.2 Boring Depth Criteria
Table 3.3-3. Boring depth criteria
FeatureMinimum depthExtend ifSource
Embankment toe or slopeBelow the deepest credible slip surface; 0.5 to 2 times the slope height below the toe (1.5 H is a common choice), or to rockSoft or organic soils continueDas; Look
Track subgrade10 to 15 ft below proposed grade; to rock in shallow-rock cutsSoft soils, fat clays or groundwater near the surfaceLi and others
Pavement10 ft below finished grade (DCP to 5 ft)Organics or soft fill continue below 10 ftEM 1110-1-1804
Drilled shafts and light towersExpected tip depth plus at least 10 ft, or 3 shaft diameters, whichever is deeper; poles by height in LookWeak stratum below the bearing layerA Class I railroad's bridge requirements; Look
Spread footingsAbout 2 times the footing width below the base, checked by the ASCE stress ruleCompressible layers within the stress zoneA Class I railroad; Das
Culverts2 to 4 times the span below the invert, and through compressible soilsHigh fill over soft groundLook
RockCore about 10 ft into rock to confirm it is not a boulderVoids or clay seams in karstLook
trial slip surfaceShoulderthrough fill and soft soilsUpslope toe1.5 H below toe or to rockDownslope toe1.5 H below toe or to rockH = slope heightbelow the deepest credible slip surfaceFoundation soil
Figure 3.3-2. Boring locations and depths on a railroad embankment. The shoulder boring is taken through the fill and any soft soils below it; the toe borings extend at least 1.5 times the slope height below the toe, or to rock, so that they reach below the deepest credible slip surface.
Light-tower borings (8 x 35 ft)280 ftPavement borings (11 x 10 ft)110 ftSlope-toe borings (8 x 15 ft)120 ftDitch borings (2 x 6 ft)12 ftRock core contingency15 ftDrilled footage by boring type, two recent programs
Figure 3.3-3. Footage by boring type in two recent railroad programs (390 ft and 147 ft). Foundation borings dominate the footage even when shallow subgrade borings dominate the count.
← Previous · 3.0 Risk Management Chapter 3.2 — Desktop Study
Next · 3.0 Risk Management → Chapter 3.4 — Site Review and Reconnaissance