3.3.7 The Request for Proposal to Contract Drillers

Deciding where, how deep and how many borings and tests a site needs, and writing it so a driller can price it.
Author: Daniel P. Colwell
3.3.7 The Request for Proposal to Contract Drillers

The RFP turns the scope into something a driller can price. A standard RFP covers the items below; leaving any of them out invites a quote that cannot be compared with the others or a change order later.

Table 3.3-8. Contents of a contract drilling RFP
SectionContent
Project overview and locationPurpose, site, railroad, map file with proposed borings and access routes
AccessTruck or ATV rig; clearing by whom; water tank access; overhead and underground utilities
Driller's scopeOne-call locate; site reconnaissance with a flagman before drilling, with a call to the engineer before leaving site
Drilling and samplingBoring table (ID, location, depth, method, sampling); SPT interval; tubes; core size; water source or air coring; ability to drill cobbles and boulders
Site cleanup and backfillGrout or cuttings per railroad, local, state and federal requirements; disposal of excess cuttings
Samples and laboratoryPackaging and shipping; tests the driller may be asked to run (with standards) and how results are reported
Consultant's scopeUtility coordination with the railroad; flagging; field engineer to log and handle samples; landowner coordination
Cost tabulationLocate, reconnaissance, clearing, mobilization, drilling and coring per foot, tubes, backfill, standby per hour (assumed hours), per diem, shipping, laboratory tests, office time
DocumentationInsurance certificates; railroad safety training and badges; start date after notice to proceed
TermsPayment terms; insurance minimums and additional insured; rider for work near track
Revise the RFP, do not re-send it informally. When borings are added or depths change, issue a numbered revision with a short list of changes and the new totals (for example, Revision 2: 10 borings, 132 ft, 15 ft coring contingency, up to 16 Shelby tubes).