Record groundwater at first encounter, at completion and, where it matters, after 24 hours. On soft-ground and slope projects a 24-hour reading is worth the short return trip. Where seepage or pore pressure controls design (slopes, levee-like fills, culverts), add observation wells or vibrating-wire piezometers and leave them in place; on unstable slopes add an inclinometer at the critical section (Chapter 5.3).