Chapter 3.9 — Investigation Planning: groundwater monitoring duration requirements by phase; piezometer installation as mandatory boring scope item
Chapter 4.1 — Borings and Sampling: FEWL and SWL observation protocols; borehole conditioning before Shelby tube sampling in saturated soils
Chapter 5.1 — In Situ Testing: CPTu pore pressure ratio B_q for consolidation state assessment; VST applicability limited to undrained conditions
Chapter 6.1 — Bearing Capacity: effective stress as input to all bearing capacity calculations; design GWT selection
Chapter 6.2 — Settlement Analysis: pore pressure dissipation as the mechanism of primary consolidation; c_v from oedometer governs consolidation rate
Chapter 6.3 — Slope Stability: phreatic surface location governs pore pressure distribution in Bishop Simplified analysis; rapid drawdown loading condition
Chapter 6.5 — Seismic/Liquefaction: saturation condition (degree of saturation Sr = 1.0) required for liquefaction triggering; GWT depth directly determines whether a sand layer is susceptible
Chapter 7.2 — Ground Improvement: PVD installation to accelerate pore pressure dissipation in soft clays; preloading surcharge triggers consolidation monitored by piezometers
Chapter 5.3 — Construction Monitoring: piezometer reading triggers for staged embankment loading; VW alarm thresholds for high-speed passenger corridor construction