Slug tests estimate the hydraulic conductivity (k) of the soil or rock at the piezometer screen interval by measuring the rate of water level recovery after a sudden injection or withdrawal of a known volume.
k = [r_c² × ln(R_e / r_w)] / [2 × L_e × t] × ln(y_0 / y_t)
Where:
Plot ln(y_t/y_0) vs. t; slope = −k × 2L_e / [r_c² × ln(R_e/r_w)].
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | [r_c² × ln(R_e / r_w)] / [2 × L_e × t] × ln(y_0 / y_t) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| rc | casing radius (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| rw | effective well radius including gravel pack (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| Re | effective radius of influence (ft) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Le | length of screen (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| t | time elapsed from slug introduction (days) | Time | Elapsed test time (recorded) or the analysis time chosen for design. | project-specific |
| y0 | initial displacement from static water level (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| yt | displacement at time t (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
For granular soils in the laboratory:
k = Q × L / (A × Δh × t)
Where:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | Q × L / (A × Δh × t) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| Q | volume of water collected (ft³) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| L | specimen length (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| A | cross-sectional area of specimen (ft²) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| Δh | head difference across specimen (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| t | collection time (s) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
k = (a × L / A × t) × ln(h₁ / h₂)
Where:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | (a × L / A × t) × ln(h₁ / h₂) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| a | standpipe cross-sectional area (ft²) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| h₁ | initial head (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| h₂ | final head after time t (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| L | specimen length (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| A | specimen cross-sectional area (ft²) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
For aquifer characterization on major railroad projects requiring dewatering design:
T = 2.303 × Q / (4π × Δs)
Where:
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| T | intermediate value computed on this page | Another equation | Computed: T = 2.303 × Q / (4π × Δs) | project-specific |
| Q | pumping rate (ft³/day | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| Δs | drawdown per log cycle on s vs | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
k = T / b
Where b = saturated aquifer thickness (ft).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | T / b | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| b | saturated aquifer thickness (ft). | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
S = 2.25 × T × t₀ / r²
Where t₀ = time intercept where the Cooper-Jacob straight line intersects s = 0 on the time axis (days), and r = distance to observation well (ft).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| t₀ | time intercept where the Cooper-Jacob straight line intersects s = 0 on the time axis (days), and r = distance to observation well (ft). | Time | Elapsed test time (recorded) or the analysis time chosen for design. | project-specific |
| USCS Symbol | Soil Type | k (ft/day) | k (ft/s) |
|---|---|---|---|
| GW, GP | Clean gravel | 100 – 3,000 | 1.2×10⁻³ – 3.5×10⁻² |
| SW, SP | Clean sand | 10 – 300 | 1.2×10⁻⁴ – 3.5×10⁻³ |
| SM | Silty sand | 0.3 – 10 | 3.5×10⁻⁶ – 1.2×10⁻⁴ |
| ML | Silt | 0.003 – 0.3 | 3.5×10⁻⁸ – 3.5×10⁻⁶ |
| CL | Lean clay | 0.0003 – 0.01 | 3.5×10⁻⁹ – 1.2×10⁻⁷ |
| CH | Fat clay | < 0.0001 | < 1.2×10⁻⁹ |
| Fractured rock | Variable | 0.03 – 300 | 3.5×10⁻⁷ – 3.5×10⁻³ |
GEC 5 recommends estimating k from soil type and grain size before reducing test data, then treating any discrepancy of more than about two orders of magnitude as a sign of test error or unusual soil. Hazen’s equation, k (ft/day) = 2,835·C·d102 with C = 0.4–1.2 and d10 in mm, applies only to clean sands (< 5% passing No. 200, d10 = 0.0039–0.12 in.). Against slug tests in an alluvial sand aquifer, its error ranged from slight to more than one order of magnitude.
Robertson and Cabal (2010) relate k to the soil behavior type index: k = 10(0.952 − 3.04 Ic) m/s for 1.0 < Ic ≤ 3.27, and k = 10(−4.52 − 1.37 Ic) m/s for 3.27 < Ic < 4.0. The relationship is approximate, but a CPTu profile shows thin pervious seams between piezometer screens that point tests miss. For soft clays (after Jamiolkowski et al., 1985) kh/kv is about 1–1.5 for homogeneous deposits, 2–4 for sedimentary clays with discontinuous pervious lenses, and 3–15 for varved clays with continuous pervious layers — the ratio needed for the transformed flow-net section above.
Source: Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017)) · Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & Testing