↑ Parent Menu⌂ Main Menu
← Chapter 2.8 Groundwater Characterization and Seepage
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

Supplemental References

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.
Authors: Daniel P. Colwell and Mario Ruel
Supplemental References

Material in the green “Supplemental reference” boxes throughout this chapter was added from the following documents in the LEVI geotechnical library. Text is summarized or paraphrased; tables are reproduced with their original source noted; figures are reproduced from the cited document for internal reference use. Consult the original document before relying on a value for design. Blocks marked “After Selig & Waters (1994)” summarize item S6 for railroad clients; tables are condensed from the book and its figures are not reproduced. Blocks tagged “Project management” summarize methods, examples and figures from the project-management, estimating and construction-management books listed here, applied to railroad work; the closing “For railroad work” note in each block is added by the authors of this manual.

  1. U.S. Army Corps of Engineers (1986, Change 1 1993). Seepage Analysis and Control for Dams. EM 1110-2-1901Find source ↗Library entry
  2. Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017))Find source ↗Library entry
  3. Robertson, P. K. and Cabal, K. L. (2010). Guide to Cone Penetration Testing for Geotechnical Engineering, 4th ed. Gregg Drilling & TestingFind source ↗Library entry
  4. Profillidis, V. A. (2014). Railway Management and Engineering, 4th ed. Farnham, UK: Ashgate. Chapters 7–9, 11–13, 16–17, 20 and 22 (track system, mechanical behavior of track, subgrade, sleepers, ballast, transverse effects, maintenance, slab track, electrification foundations, safety)Find source ↗Library entry
  5. Geotechnology for Railroaders Program, Modules 1–8 (two-day training course reference: risk management, geology and soils, ballast and sub ballast, drainage, slides, slope and subgrade stabilization, scour, rock falls, beaver dams, winter problems, spring thaw, extreme weather, earthquakes). Field photographs and figures from the course; slope stabilization process slides adapted from material by D. ColwellFind source ↗
  6. Selig, E. T. and Waters, J. M. (1994). Track Geotechnology and Substructure Management. London: Thomas Telford. Used on this page: chs. 3 and 13Find source ↗Library entry
  7. Smith, J. G., and Hinze, J. (2010). Construction Management: Subcontractor Scopes of Work. Boca Raton, FL: CRC Press. Used on this page for project-management materialFind source ↗
  8. Randle, T. J. and Bountry, J. (2017). Dam Removal Analysis Guidelines for Sediment. Advisory Committee on Water Information, Subcommittee on Sedimentation. Denver, CO: U.S. Bureau of Reclamation, Technical Service Center. Used on this page: Section 2.8.15Find source ↗
← Previous · 2.0 The Underworld Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.9 — Collapsible Soils: Identification, Testing and Railroad Impacts