2.8.12 Practice Questions

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.
Authors: Daniel P. Colwell and Mario Ruel
2.8.12 Practice Questions
Each question is worked in the same five parts as the examples.
Question 2.8-1: Pore Pressure From a Standpipe Reading

Problem Statement

A cut slope on a Class I railroad has been sloughing onto the ditch line after wet springs. An open standpipe piezometer was installed in the slope, and three months later the water stood 18.4 ft below the casing top. The engineer must convert the reading to a water elevation and a pore pressure at the screen for the slope stability analysis, and say whether the condition is artesian.

Ditch / trackCasing top El. 842.618.4 ftScreen 30–35 ft (mid El. 810.1)Water El. = ?u at mid-screen = ? Artesian?GivenCasing top El. 842.6 ft (NAVD 88)Reading 18.4 ft below casing topScreen 30–35 ft; mid El. 810.1Required(a) Water surface elevation(b) Pore pressure at mid-screen(c) Artesian?Black = given; red = required
Given and required for Question 2.8-1.

Given

VariableValueDescription
Casing topEl. 842.6 ft NAVD 88About at the ground surface
Reading18.4 ft below the casing topThree months after installation
Screen30 to 35 ft; mid-screen at 32.5 ft (El. 810.1)

Required

  • (a) Water surface elevation
  • (b) Pore pressure at mid-screen
  • (c) Whether the condition is artesian

Equations

  1. Eq. 1: h = El.water − El.point — pressure head
  2. Eq. 2: u = γw h

Steps

Step 1 · (a) Water elevation
842.6 − 18.4
El. 824.2 ft
↓
Step 2 · (b) Pressure head and u
824.2 − 810.1 = 14.1 ft; 62.4 × 14.1
u = 880 psf (0.44 tsf)
↓
Step 3 · (c) Artesian?
824.2 < 842.6 (ground)
No: the piezometric level is 18.4 ft below grade
↓
Solution
El. 824.2 ft; u = 880 psf; not artesian.

Solution

(a) El. 824.2 ft. (b) u = 880 psf. (c) Not artesian.

Whether the zone is confined depends on the stratigraphy, not on the piezometer type. One reading three months after installation is a start; seasonal readings are needed before a design level is chosen.

Question 2.8-2: Seepage and Piping From a Flow Net

Problem Statement

Water is seeping from the toe of a railroad embankment that acts as a levee during floods on an adjacent river. A flow net drawn for the flood condition gives the flow channels, head drops and exit path length shown. The engineer must compute the seepage through the embankment, the exit gradient and the safety against piping, and say what the railroad should do.

A flow net for an embankment gives the seepage quantity directly, and the spacing of the last equipotentials gives the exit gradient.

Foundation fine sandRiver (flood)q, iexit, FS = ?H = 22 ft head lossGivenNf = 4; Nd = 12H = 22 ft; k = 0.8 ft/daylexit = 1.5 ftGs = 2.66; e = 0.68Required(a) Seepage per unit width q(b) Exit gradient(c) FS against pipingBlack = given; red = required
Given and required for Question 2.8-2.

Given

VariableValueDescription
Nf, Nd4 and 12Flow channels and equipotential drops
H22 ftTotal head loss
k0.8 ft/day
lexit1.5 ftPath length of the last drop
Gs, e2.66 and 0.68Exit soil

Required

  • (a) Seepage per unit width
  • (b) Exit gradient
  • (c) FS against piping

Equations

  1. Eq. 2.8-21: q = k H Nf/Nd — per unit length
  2. Eq. 2.8-23: iexit = (H/Nd)/lexit
  3. Eq. 2.8-15: icr = (Gs − 1)/(1 + e) — critical hydraulic gradient
  4. Eq. 2.8-16: FSpiping = icr / iexit

Steps

Step 1 · (a) q
0.8 × 22 × 4/12
q = 5.87 ft³/day per ft
↓
Step 2 · (b) iexit
22/12 = 1.833 ft per drop; 1.833 / 1.5
iexit = 1.22
↓
Step 3 · (c) FS
icr = 1.66/1.68 = 0.988; 0.988 / 1.22
FS = 0.81 < 1.0
Spot check: An exit gradient above the critical gradient means the soil at the toe is already quick.
↓
Solution
q = 5.87 ft³/day/ft; iexit = 1.22; FS = 0.81: piping.

Solution

(a) 5.87 ft³/day per ft. (b) iexit = 1.22. (c) FS = 0.81: the exit is unstable and piping is occurring.

This is an emergency condition: report it to the railroad’s engineer at once, recommend a slow order, and install a filtered toe drain or weighted filter berm. Check the flow net too: a gradient this high often means the net was drawn too coarsely near the toe.

Question 2.8-3: Slug Test in a Silty Soil

Problem Statement

An intermodal yard is adding a buried pump station, and the excavation will extend below the water table in silty soil. A slug test in a piezometer at the yard gave the well geometry and head recovery shown. The engineer must compute the hydraulic conductivity and recommend a dewatering method for the excavation.

The same method as Example 2.8-2 at an intermodal yard piezometer.

Silty soil (intermodal yard)Screen Le static water levely0 = 0.60 ftyt = 0.22 ft at 5 minRe = 2.8 ftk = ? Dewatering method?Givenrc = 0.083 ft; rw = 0.125 ftLe = 5 ft; Re = 2.8 fty0 = 0.60 ft; yt = 0.22 ft at 5 minRequiredk in ft/day and ft/sDewatering methodBlack = given; red = required
Given and required for Question 2.8-3.

Given

VariableValueDescription
rc, rw0.083 ft; 0.125 ft
Le, Re5 ft; 2.8 ft
y0, yt0.60 ft; 0.22 ft at 5 min (0.00347 day)

Required

  • k in ft/day and ft/s
  • Appropriate dewatering method

Equations

  1. Eq. 2.8-5: k = [rc² ln(Re/rw) / (2 Le t)] ln(y0/yt) — Bouwer and Rice slug test

Steps

Step 1 · Geometry term
0.083² × ln 22.4 = 0.006889 × 3.109
0.02143 ft²
↓
Step 2 · Divide by 2Let
0.02143 / 0.0347
0.6175
↓
Step 3 · k
0.6175 × ln 2.727 = 0.6175 × 1.003
k = 0.62 ft/day = 7.2 × 10−6 ft/s
Spot check: 0.62 / 86,400 = 7.2 × 10−6.
↓
Solution
k = 0.62 ft/day: eductor wells.

Solution

k = 0.62 ft/day (7.2 × 10−6 ft/s), at the silty sand to silt boundary.

Eductor wells suit this range (about 0.001 to 1.0 ft/day, Section 2.8.6.1); standard wellpoints may be marginal. State the recommendation in the dewatering feasibility section of the geotechnical report.

Question 2.8-4: Local Scour at a Bridge Pier

Problem Statement

A Class I railroad bridge located on the St. Lawrence River has round-nosed piers in a sand bed. The bridge is being evaluated for the 100-year flood with the flow depth and velocity shown. The engineer must compute the local scour at a pier so it can be added to the other scour components and compared with the pier foundation depth.

A round-nosed pier of a Class I railroad bridge located on the St. Lawrence River. Local scour is computed with the CSU equation of HEC-18; it is added to long-term degradation and contraction scour to set the foundation depth.

Sand bedV1 = 8.5 ft/sy1 = 22 fta = 4.5 ft, round noseys = ?Givena = 4.5 ft (round nose)y1 = 22 ft; V1 = 8.5 ft/sK1–K4 = 1.0, 1.0, 1.1, 1.0100-year floodRequiredLocal pier scour depth ys Black = given; red = required
Given and required for Question 2.8-4.

Given

VariableValueDescription
a4.5 ftPier width
y122 ftUpstream flow depth, 100-year flood
V18.5 ft/sUpstream velocity
K1, K2, K3, K41.0, 1.0, 1.1, 1.0Nose shape, angle of attack, bed condition (clear-water), armoring

Required

  • Local pier scour depth ys

Equations

  1. Eq. 1: Fr1 = V1 / √(g y1) — Froude number
  2. Eq. 2.8-18: ys/y1 = 2.0 K1K2K3K4 (a/y1)0.65 Fr10.43 — CSU equation, HEC-18

Steps

Step 1 · Fr1
8.5 / √(32.2 × 22) = 8.5 / 26.62
0.319
↓
Step 2 · Power terms
(4.5/22)0.65 = 0.20450.65; 0.3190.43
0.356 and 0.612
↓
Step 3 · ys (Eq. 2.8-18)
ys/22 = 2.0 × 1.1 × 0.356 × 0.612 = 0.480
ys = 10.6 ft
Spot check: ln 0.2045 = −1.588; × 0.65 = −1.032; e−1.032 = 0.356.
↓
Solution
ys ≈ 10.6 ft.

Solution

About 10.6 ft of local scour.

The foundation must extend at least this far below the design streambed, plus long-term degradation and contraction scour. Pass the result to the railroad’s bridge engineers for the AREMA Chapter 8 foundation design.

Question 2.8-5: Artesian Pressure Under a Clay Cap

Problem Statement

A Class I railroad plans a new embankment over soft marine clay at a coastal yard. A vibrating-wire piezometer in the sand beneath the clay shows a spring high head 1.5 ft above the ground surface. The engineer must find the pore pressure and effective stress at the base of the clay and explain what the artesian condition means for the embankment and for any excavation into the clay.

A new embankment is planned over soft marine clay at a coastal site. A piezometer in the sand below the clay shows a head above the ground surface. Artesian pressure lowers the effective stress in the clay and can lift the clay cap if it is thinned by excavation.

Soft marine clay, γ = 118 pcfSand (confined aquifer)Head El. 15.8Ground El. 14.3Clay base El. 4.3u, σ′ at clay base = ?Meaning for embankment?GivenHead El. 15.8 ft (spring high)Ground El. 14.3 ftClay base El. 4.3 ftγ = 118 pcf (clay)Required(a) u at the clay base(b) σ′ vs hydrostatic(c) Meaning for the embankmentBlack = given; red = required
Given and required for Question 2.8-5.

Given

VariableValueDescription
HeadEl. 15.8 ft NAVD 88, spring highVW piezometer in the sand below the clay
GroundEl. 14.3 ftHead is 1.5 ft above grade
Clay baseEl. 4.3 ft (10 ft below grade)
γ118 pcfClay total unit weight

Required

  • (a) Pore pressure at the base of the clay
  • (b) Effective stress, compared with hydrostatic
  • (c) What it means for the embankment

Equations

  1. Eq. 1: u = γw (El.head − El.point)
  2. Eq. 2: σ′v = σv − u
  3. Eq. 3: FSuplift = σv / u — at the base of the cap

Steps

Step 1 · (a) u
15.8 − 4.3 = 11.5 ft; 62.4 × 11.5
u = 718 psf
↓
Step 2 · (b) σ′v
σv = 118 × 10 = 1,180 psf; 1,180 − 718
σ′v = 462 psf
↓
Step 3 · Hydrostatic comparison
u = 62.4 × 10 = 624 psf; 1,180 − 624 = 556 psf
Artesian head lowers σ′v by 17%
↓
Step 4 · Uplift margin (Eq. 3)
1,180 / 718
FSuplift = 1.6
↓
Solution
u = 718 psf; σ′v = 462 psf (17% below hydrostatic); uplift FS = 1.6.

Solution

(a) 718 psf. (b) 462 psf, 17% less than the hydrostatic 556 psf. (c) Uplift FS of the clay cap is 1.6.

The clay keeps some strength, but its effective stress, and the strength it will gain under the new fill, are lower than a hydrostatic analysis would show. Any excavation into the cap (ditches, culvert trenches, foundation pits) cuts the uplift margin quickly. Tell the railroad’s engineer the measured spring-high head, the reduced effective stress and the uplift margin; base the stability and settlement analyses on the spring-high head, and consider relief wells or staged loading with piezometer control.

Question 2.8-6: Sediment From a Dam Removal Upstream of a Railroad Bridge

Problem Statement

A state agency plans to remove a low-head dam 3.2 miles upstream of a multi-span bridge on a Class I railroad located in Pennsylvania. The reservoir is nearly full of coarse sand and gravel with little vegetation. At the design flood the bridge low chord has 3.5 ft of freeboard, and the reach just upstream of the bridge is where the river flattens and bars already form. The railroad’s engineer must screen the probability of sediment impact, estimate how much sediment could move in the first year, rate the risk to the bridge, and judge whether deposition could take away the freeboard (Section 2.8.15).

Reservoir pool Stored sediment V = 180,000 yd³, γd = 100 pcf Low-head dam Deposition reach 0.6 mi, B = 120 ft Required: deposit thickness t Railroad bridge 3.5 ft 3.2 mi downstream Flow Given: V, γd, Qs = 95,000 tons/yr, coarse unvegetated deposit, 3.5 ft freeboard Required: Ts and probability, first-year erosion, risk, deposit thickness t at the bridge reach
Figure 2.8-19. Question 2.8-6: dam, stored sediment and railroad bridge (not to scale).

Given

VariableValueDescription
Vs180,000 yd³Sediment stored behind the dam
γd100 pcfDry unit weight of the deposit
Qs95,000 tons/yrAverage annual sediment load entering the reservoir
DepositCoarse sand and gravel, unvegetatedFirst-year erosion average 43% (range 1% to 77%)
ConsequenceMediumLoss of bridge freeboard; no other infrastructure in the reach
Deposition reachL = 0.6 mi (3,168 ft), B = 120 ftFlat reach just upstream of the bridge
fdep25%Assumed share of the first-year eroded volume that deposits in this reach
Freeboard3.5 ftLow chord above the design flood stage

Required

  • (a) Relative reservoir sediment volume Ts and the probability class
  • (b) Sediment eroded in the first year (average and upper range)
  • (c) Risk of sediment impact
  • (d) Average deposit thickness in the bridge reach, compared with the freeboard

Equations

  1. Eq. 2.8-27: Ts = Ms / Qs, with Ms = Vs × 27 × γd / 2,000 (tons) — years of annual load stored
  2. Eq. 2.8-28: t = fdep V1 × 27 / (L B) — average deposit thickness over the reach
  3. Probability: Ts < 0.1 negligible; 0.1–1 small; 1–10 medium; > 10 large. Risk from Table 2.8-16.

Steps

Step 1 · (a) Stored mass
180,000 × 27 × 100 / 2,000
Ms = 243,000 tons
↓
Step 2 · (a) Ts
243,000 / 95,000
Ts = 2.6 yr → medium probability
Spot check: In volume, the annual load is 95,000 × 2,000 / 100 / 27 = 70,400 yd³/yr; 180,000 / 70,400 = 2.6 yr. Same answer.
↓
Step 3 · (b) First-year erosion
0.43 × 180,000; upper range 0.77 × 180,000
V1 ≈ 77,400 yd³ (up to 138,600 yd³)
↓
Step 4 · (c) Risk
Medium probability × medium consequence (Table 2.8-16)
Moderate risk
↓
Step 5 · (d) Deposit thickness
0.25 × 77,400 × 27 / (3,168 × 120) = 522,450 / 380,160
t ≈ 1.4 ft (2.5 ft at the upper range)
Spot check: 1.4 ft is 40% of the 3.5 ft freeboard. Bed aggradation raises the flood stage by roughly the same amount, so the margin falls to about 2.1 ft on average and about 1 ft at the upper range. Deposition is never uniform: bars can be several times the average thickness.
↓
Solution
Ts = 2.6 yr (medium); about 77,000 yd³ eroded in year one; moderate risk; about 1.4 to 2.5 ft of deposit in the bridge reach.

Solution

(a) Ts = 2.6 years: medium probability. (b) About 77,000 yd³ in the first year, possibly up to about 139,000 yd³. (c) Moderate risk. (d) About 1.4 ft average deposit (2.5 ft at the upper range), using up 40% to 70% of the freeboard.

Moderate risk is enough to justify a sediment analysis by the removal team, not just a screening. The railroad should ask for predicted deposition at the bridge, survey cross sections at the bridge before removal and after each significant flood for at least two to four years, check the waterway opening and drift clearance, and add the removal schedule to the bridge’s live rating triggers. Ask too whether phased removal or a slower drawdown can spread the sediment release over more floods. The 25% deposition share is an assumption made for screening; the removal team’s sediment transport model should replace it.