Authors: Daniel P. Colwell and Mario Ruel. This chapter was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.
Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.
Primary sources
- USACE EM 1110-1-1804, Geotechnical Investigations (2001), Sections 5-1 through 5-8Find source ↗
- USACE EM 1110-2-1901, Seepage Analysis and Control for Dams (1993)Find source ↗Library entry
- ASTM D1586, D4750, D4044 (withdrawn 2024), D2434, D5084, D5856Official page ↗
- FHWA HEC-18, Evaluating Scour at BridgesFind source ↗Library entry
- AREMA MRE Chapter 1, Sections 1.3–1.4Official page ↗
- Client railroad engineering standards as cited in the textFind source ↗
Supplemental references
File locations for these documents are listed under Supplemental References.
Project management sources
- Smith, J. G., and Hinze, J. (2010). Construction Management: Subcontractor Scopes of Work. Boca Raton, FL: CRC PressFind source ↗