↑ Parent Menu⌂ Main Menu
← Chapter 2.8 Groundwater Characterization and Seepage
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.8.8 Representative Groundwater Monitoring Data Table

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.
Authors: Daniel P. Colwell and Mario Ruel
2.8.8 Representative Groundwater Monitoring Data Table
Table 2.8-2. Seasonal Piezometer Data — Illustrative Coastal Site (hypothetical values), VW Transducer Network
Piezometer IDInstalled Depth (ft)Screen Elev. (ft NAVD88)Winter High (ft NAVD88)Spring High (ft NAVD88)Summer Low (ft NAVD88)Seasonal Fluctuation (ft)Notes
P-1224.814.215.810.65.2Confined; spring high about 11 ft below grade
P-235−8.6−4.2−3.1−7.44.3Confined aquifer; head well below grade
P-3188.213.414.711.13.6Unconfined; tidal influence observed
P-41412.616.317.013.83.2Near marsh; spring high about 10 ft below grade
P-5280.48.89.65.93.7Deep confined zone; no artesian head

The ground surface at each piezometer is about the screen elevation plus the installed depth (26 to 28 ft NAVD 88), so none of them shows artesian head; the spring highs govern design. Set VW alarm thresholds against the design heads assumed in the stability analysis, and keep construction dewatering heads at or below those values throughout embankment placement.

← Previous · 2.0 The Underworld Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.9 — Collapsible Soils: Identification, Testing and Railroad Impacts