↑ Parent Menu⌂ Main Menu
← Chapter 2.8 Groundwater Characterization and Seepage
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · click a car to open it

2.8.7 Worked Examples

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.
Authors: Daniel P. Colwell and Mario Ruel
2.8.7 Worked Examples
The three examples cover the three groundwater numbers a railroad design needs most: the effective stress at the design water level, the permeability of a water-bearing layer, and the margin against piping. Each is laid out as Given, Required, Equations, a flow chart of the steps with a spot check at each, and the Solution.
Example 2.8-1: Effective Stress With a Seasonal Water Table

An embankment carrying a double-track main line on a Class I railroad located in coastal North Carolina sits on 4 ft of fill over soft lean clay. The water table swings through the year. Effective stress, and with it the strength of the clay, is lowest when the water is highest, so the question is how much the seasonal rise costs.

Fill 0–4 ft, γ = 125 pcfSoft lean clay 4–15 ftγ 110 sat / 90 above GWTDry season, 9 ftWet season (SHWT), 2.5 ftσ′v at 12 ft = ?Reduction = ?GivenFill 0–4 ft; γ = 125 pcfClay 4–15 ft; 110 / 90 pcfzw,dry = 9 ft; zw,wet = 2.5 ftCheck depth z = 12 ftRequiredσ′v at 12 ft, dry and wetReduction from the seasonal riseBlack = given; red = required
Given and required for Example 2.8-1.

Given

VariableValueDescription
Fill0 to 4 ft, γ = 125 pcfDepths measured from the top of the embankment
Clay4 to 15 ft; γ = 110 pcf saturated, 90 pcf above the water tableSoft lean clay (CL)
zw,dry9 ftSummer low water table
zw,wet2.5 ft (1.5 ft above the base of the fill)Seasonal high water table (SHWT)
z12 ft (8 ft into the clay)Depth of the check

Required

  • Effective vertical stress at 12 ft in the dry and wet seasons
  • The reduction caused by the seasonal rise

Equations

  1. Eq. 1: σv = Σ γi hi — total stress
  2. Eq. 2: u = γw (z − zw) — hydrostatic pore pressure
  3. Eq. 3: σ′v = σv − u

Steps

Step 1 · Dry season (Eq. 1 to 3)
σv = 125(4) + 90(5) + 110(3) = 1,280 psf; u = 62.4(12 − 9) = 187 psf
σ′v = 1,093 psf
↓
Step 2 · Wet season (Eq. 1 to 3)
σv = 125(4) + 110(8) = 1,380 psf; u = 62.4(12 − 2.5) = 593 psf
σ′v = 787 psf
Spot check: Total stress rises by 100 psf as the clay wets, but pore pressure rises by 406 psf, so the effective stress falls.
↓
Step 3 · Reduction
(1,093 − 787) / 1,093
28%
↓
Solution
σ′v falls from 1,093 to 787 psf, 28%.

Solution

The effective vertical stress at 12 ft is 1,093 psf in the dry season and 787 psf at the seasonal high water table, a reduction of 28%.

Drained strength, and the strength the clay gains under new load, scale with effective stress, so the wet-season condition governs. Use the seasonal high water table for bearing capacity and stability analyses, and size the piezometer monitoring (Section 2.8.2) to capture the high, not an average.

Example 2.8-2: Slug Test in a Fine Sand

A standpipe piezometer in a fine sand layer on a short-line railroad located in coastal Louisiana is tested by adding a slug of water and timing the recovery. The Bouwer and Rice method converts the recovery rate to a hydraulic conductivity, which decides whether and how the sand can be dewatered.

Fine sandScreen Le static water levely0 = 0.50 ftyt = 0.12 ft at 3 minRe = 3.2 ftk = ? Dewatering method?Givenrc = 0.0833 ft; rw = 0.125 ftLe = 5.0 ft (12–17 ft)Re = 3.2 ft (Bouwer–Rice)y0 = 0.50 ft; yt = 0.12 ft at 3 minRequiredHydraulic conductivity kMeaning for dewateringBlack = given; red = required
Given and required for Example 2.8-2.

Given

VariableValueDescription
rc0.0833 ft (1.0 in.)Casing inner radius
rw0.125 ft (1.5 in.)Effective well radius with sand pack
Le5.0 ftScreen length, 12 to 17 ft depth
Re3.2 ftEffective radius from the Bouwer and Rice chart
y00.50 ftInitial head displacement
yt0.12 ft at t = 3 min (0.00208 day)Recovery reading

Required

  • Hydraulic conductivity k
  • What it means for dewatering

Equations

  1. Eq. 2.8-5: k = [rc² ln(Re/rw) / (2 Le t)] ln(y0/yt) — Bouwer and Rice slug test

Steps

Step 1 · Geometry term
0.0833² × ln(3.2/0.125) = 0.006944 × 3.243
0.02252 ft²
↓
Step 2 · Divide by 2Let
0.02252 / (2 × 5.0 × 0.00208) = 0.02252 / 0.0208
1.08 ft/day
↓
Step 3 · Recovery term and k
ln(0.50/0.12) = ln 4.17 = 1.427; 1.08 × 1.427
k = 1.54 ft/day
Spot check: Same order as the 0.3 to 10 ft/day range for silty fine sand in Section 2.8.4.5.
↓
Solution
k = 1.54 ft/day.

Solution

k ≈ 1.5 ft/day, consistent with the SM classification from the sieve analysis.

That permeability is within the range where wellpoints work, so construction dewatering is feasible; well spacing and yield can be designed as in Section 2.8.6. A single slug test samples only a small volume around the screen, so a pumping test is worth running if dewatering cost is significant.

Example 2.8-3: Piping at the Toe of a Bridge Embankment

A bridge embankment 18 ft high stands beside a river that floods. When the river is up, water seeps under the fill and exits at the downstream toe. If the upward gradient there approaches the critical gradient, the sand boils and piping can start.

Foundation fine sandRiver (flood)FS piping = ?iexit = 0.28Giveniexit = 0.28 (flow net)Gs = 2.65; e = 0.72Target FS ≥ 4.0 (unfiltered exit)With toe drain: iexit = 0.22RequiredFS against piping nowFS with a toe drainBlack = given; red = required
Given and required for Example 2.8-3.

Given

VariableValueDescription
iexit0.28Exit gradient at the toe, from the flow net
Gs2.65Foundation fine sand
e0.72Void ratio
TargetFS ≥ 4.0Unfiltered exit beside a waterway (Section 2.8.5.3)
iexit with drain0.22Estimated with a toe drain

Required

  • Factor of safety against piping, now and with a toe drain

Equations

  1. Eq. 2.8-15: icr = (Gs − 1)/(1 + e) — critical hydraulic gradient
  2. Eq. 2.8-16: FSpiping = icr / iexit

Steps

Step 1 · icr (Eq. 2.8-15)
1.65 / 1.72
icr = 0.959
↓
Step 2 · FS now (Eq. 2.8-16)
0.959 / 0.28
FS = 3.43 < 4.0: target not met
↓
Step 3 · FS with a toe drain
0.959 / 0.22
FS = 4.36 ≥ 4.0
↓
Solution
FS = 3.43 now; 4.36 with a toe drain.

Solution

FSpiping = 3.43, below the 4.0 target. A toe drain that lowers the exit gradient to 0.22 raises it to 4.36.

The target is high because piping, once started, works backward under the embankment and gives little warning. Report the finding to the railroad’s engineer promptly, and include the flow net and the calculation in the preliminary geotechnical design memorandum (Chapter 8.4). The drain must be filtered against the sand (Section 2.4.7), or it will carry the sand away instead of the water.

← Previous · 2.0 The Underworld Chapter 2.7 — Rock and Sand: Properties, Typical Values and Behavior
Next · 2.0 The Underworld → Chapter 2.9 — Collapsible Soils: Identification, Testing and Railroad Impacts