2.8.11 Groundwater Investigation Checklist

Groundwater is the single most consequential subsurface variable in railroad geotechnical engineering.
Authors: Daniel P. Colwell and Mario Ruel
2.8.11 Groundwater Investigation Checklist

Checklist · Part V · Subsurface Exploration

Groundwater Investigation Checklist

Pre-Mobilization0 of 5
During Drilling0 of 4
During Monitoring0 of 4
Post-Field0 of 5
Ticks are saved in this browser.
Plain text version

Pre-Mobilization

  • [ ] Seasonal monitoring duration confirmed per client requirements (Section 2.8.3.4)
  • [ ] Piezometer installation plan prepared: type, depth, screen interval for each boring
  • [ ] VW transducer calibration certificates on file (Class I railroad emergency response)
  • [ ] Baseline topographic survey of piezometer installation locations (NAVD 88 elevations)
  • [ ] Slug test materials staged: bailer or slug, water-level indicator, stopwatch

During Drilling

  • [ ] First-encountered water level depth and clock time recorded in every boring
  • [ ] Artesian conditions: overflow rate estimated; FEWL = ground surface (or above) flagged on log
  • [ ] Piezometer installation documented: screen depth, sand pack interval, bentonite seal depths, casing diameter
  • [ ] Initial water level reading taken immediately after installation

During Monitoring

  • [ ] Readings taken to nearest 0.01 ft with calibrated instrument
  • [ ] Date, time, weather conditions recorded at each reading event
  • [ ] Slug tests conducted in sand or gravel screen intervals; recovery plotted in field before demobilization
  • [ ] VW datalogger download confirmed on schedule; battery status checked

Post-Field

  • [ ] Seasonal high and low water table elevations (ft NAVD 88) computed from monitoring data
  • [ ] Stabilized water levels entered into project GIS (State Plane coordinates, client-required system)
  • [ ] Effective stress profile computed for design groundwater level; submitted as pre-design memo
  • [ ] Scour analysis initiated for all bridge sites (FHWA HEC-18 per AREMA MRE Chapter 8)
  • [ ] Piping FS computed for all embankment/waterway combinations; FS ≥ 4.0 confirmed