Excavations for culverts, pump stations, bridge footings and utility crossings next to track often go below the water table. Dewatering keeps the excavation dry and stable, but the drawdown spreads outward, and under the track it raises the effective stress in any soft clay, silt or organic layer that was buoyant before. The track then settles while the pumps run, often unevenly, and pumping can also pull fines out of the subgrade. A first estimate of the inflow, the number of wells and the drawdown at the track belongs in the plan before the railroad is asked for approval. Section 2.8.6 gives the wellpoint yield (Eq. 2.8-19) and Sichardt’s radius of influence (Eq. 2.8-20); this section puts them together for a whole excavation.
Equation 2.8-24. Equivalent well and steady inflow
Powers et al. (2007). a, b = plan dimensions of the excavation; s = H − h; k in ft/day; Q in ft³/day (gpm = ft³/day × 7.48/1,440). Suits excavations up to about three times as long as they are wide.
Equation 2.8-25. Sichardt well capacity
Cashman and Preene (2012). rw = radius of the screen and filter pack; hw = wetted screen length. Number of wells = design flow / qw.
Equation 2.8-26. Drawdown at distance x and settlement under the track
mv from oedometer tests (Chapter 5.2); Hc = thickness of the compressible layer under the track.
A box culvert replacement on a Class I railroad located in Indiana needs an 80 ft by 40 ft excavation in an unconfined sand aquifer. The track centerline is 60 ft from the center of the excavation and sits on 8 ft of soft clay over the sand.
| Variable | Value | Description |
|---|---|---|
| k | 30 ft/day | Pumping test |
| H | 40 ft | Saturated thickness before pumping |
| h | 22 ft | Head required: 2 ft below subgrade |
| a × b | 80 ft × 40 ft | Excavation |
| rw, hw | 6 in.; 12 ft | Well radius; wetted screen |
| Factor on flow | 1.5 | Design allowance |
| x | 60 ft | Excavation center to track |
| Hc, mv | 8 ft; 0.02 ft²/kip | Soft clay under the track |
Eight wells of about 38 gpm each will hold the water 2 ft below subgrade, but the drawdown reaches about 13 ft under the track and would settle it about 1.6 in.
That is too much to leave to routine surfacing. Options are a cutoff (sheet piles or a slurry wall) around the excavation to the clay or a deeper low-permeability layer, recharge wells between the excavation and the track, or a shorter pumping period with the track monitored daily and surfaced as needed. Whichever is chosen, set settlement trigger levels with the railroad and filter the discharge so the wells do not pump fines.
Open the dewatering calculator →
Equivalent well radius, Sichardt radius of influence, steady inflow for unconfined or confined aquifers, the number of wells from the Sichardt capacity, the drawdown profile to the track and the settlement it causes.
The summaries above are paraphrased in original wording; equations and tabulated values are standard or published. Individual railroads, clients, companies and projects are not named.