Never use the first-encountered water level as the design water table. In fine-grained soils the level first seen during drilling is often several feet below the 24-hour stabilized level. Using FEWL as the design GWT produces unconservative effective stress calculations in every subsequent analysis.
Install piezometers in every boring that will support a slope stability or embankment settlement analysis. A piezometer costs little compared with a slope failure caused by an uncharacterized high piezometric level. Install piezometers for all cut slope analyses, whether or not the owner railroad requires them.
Conduct seasonal monitoring during both wet and dry seasons on short-line Gulf Coast and Class I railroad coastal corridor projects. Single-season data is insufficient to characterize the design groundwater condition. Monitor through two seasons on coastal plain and delta corridor investigations.
Distinguish between perched, unconfined, and confined aquifer conditions in Class I railroad glaciated terrain. Multiple water-bearing zones at different piezometric levels are the rule, not the exception, in glacial till and glaciolacustrine sequences. Installing a single piezometer in a mixed-geology boring provides misleading data. Install nested piezometers (different depths, each sealed separately) wherever the boring log shows more than one permeable zone.
Report scour analysis results before issuing the 30% GDM for any Class I railroad bridge project. Scour is a design life-safety issue; the foundation depth and type may change completely based on computed scour depth, and this change must be reflected in the 30% document before structural design proceeds. Use the scour analysis to set foundation embedment depth, not to confirm it after the fact.
Include dewatering feasibility statements in all reports for projects involving construction excavation below the water table. The geotechnical report should address dewatering feasibility and give permeability data in a form the contractor's dewatering engineer can use. Do not leave this to the contractor to infer from boring logs alone.
Flag artesian conditions on the same day they are encountered in the field. Artesian pressure in a previously uncharacterized confined aquifer changes the effective stress assumption for the entire project. Contact the railroad project manager immediately by phone and follow up with a written email the same day. Do not wait for the formal report to communicate a finding of this significance.