3.4.9 Recognizing Rock Structure and Screening Cut Slopes

Planning and carrying out the site visit, and recording what the ground, the drainage and the track are telling you.
Author: Daniel P. Colwell
3.4.9 Recognizing Rock Structure and Screening Cut Slopes

The site walk is where the rock structure of a cut is first recorded, and most rock-slope trouble along track can be traced to discontinuities that were there to be seen. Mukherjee's Atlas of Structural Geology is a photographic reference arranged by structure: folds, ductile shear zones, brittle faults, boudins and mullions, veins, and various other structures such as joints, each with field photographs and a note on how to read it. On reconnaissance, its value is recognition. Slickensides on a fault surface show which way it slipped and that it is a weak, polished plane. Folded beds mean the dip changes along the cut. Closely spaced joints next to a shear zone mark a band of broken rock. Boudinaged layers break the rock into blocks that can come loose. Construction Materials and Engineering Materials 1 add the material view: rock, like concrete and masonry, is far weaker in tension and along planes of weakness than intact compression tests suggest.

3.4.9.1 What to record and how to screen it

Table 3.4-9. Structures to record on a cut-slope reconnaissance
StructureWhat to measure or noteWhy it matters
Bedding and foliationDip and dip direction at several stations; changes along the cutPlanar sliding where it dips out of the face
Joint setsDip/dip direction, spacing, persistence, aperture, infill, roughnessWedges where two sets intersect; block size
Faults and shear zonesOrientation, width of broken zone, slickensides and slip direction, gougeContinuous low-strength planes; water paths
FoldsHinge and limb orientationsDip and failure mode change along the alignment
Boudins and veinsLayer and vein orientation, block sizeLoose blocks; veins can be strong or weak planes
FaceHeight, dip and dip direction of each face segment; catchment ditch widthSets the kinematic test and rockfall reach

Equation 3.4-1. Kinematic tests (friction angle φ, lateral limit ±20°)

Planar: dip direction within 20° of the face, φ < dip < apparent face dip

Wedge: line of intersection trends within 90° of the face, φ < plunge < apparent face dip along that trend
Toppling: dip direction opposite the face within 20°, and (90° − dip) + φ < face dip
Apparent dip: tan δa = tan δ · |cos(face dip direction − trend)|

3.4.9.2 Worked example

A 70° face dipping toward 090° in rock with φ = 30° and four measured sets: bedding J1 40/100, J2 75/268, J3 60/040 and J4 55/140. The screen finds 1 planar mode (bedding, dipping out of the face at 40°), 3 possible wedges (J1×J3 plunging 40° toward 101°, J1×J4 39° toward 084°, and J3×J4 45° toward 095°) and 1 toppling set (J2, dipping steeply into the face). The J3×J4 intersection was checked by hand at 45.0° toward 094.6°. Every mode the screen flags still needs a stability check with water pressure; modes it rules out generally do not.

Record orientations as dip and dip direction (two numbers, no ambiguity) and photograph each set with a scale. A fault with slickensides or a clay-filled shear zone should be noted as its own set even if only one exposure is seen.

Open the rock orientation screen calculator →
Kinematic screening of a rock face for planar sliding, wedge sliding along joint intersections, and toppling, with intersection lines and apparent dips computed and plotted.

3.4.9.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads, clients and projects are not named.

  • S. Mukherjee, Atlas of Structural Geology: field recognition of folds, ductile and brittle shear zones, faults, slickensides, boudins, veins and jointsFind source ↗
  • P. Domone and J. Illston (eds.), Construction Materials: Their Nature and Behaviour, 4th edition: rock and stone as construction materials, strength and weatheringFind source ↗
  • M.F. Ashby and D.R.H. Jones, Engineering Materials 1: An Introduction to Properties, Applications and Design, 3rd edition: brittle fracture and the effect of flaws on strengthFind source ↗