The track is the most sensitive instrument on the site. Before walking off the right-of-way, look along the rails from both ends of the site.
| Indicator | What it may mean |
|---|---|
| Dips in profile, cross-level variation, alignment kinks | Subgrade settlement, slope movement or a soft spot over a culvert |
| Fresh ballast in one location, or ballast built up on the shoulder | Repeated surfacing to correct a recurring defect |
| Mud pumping, fouled ballast, standing water in the cribs | Poor drainage and soft subgrade |
| Narrow or steep shoulder, ballast spilling down the slope | Loss of embankment width; erosion or slope creep |
| Slow-order signs | A defect the railroad is already managing |
Ask the railroad for the geometry-car exception history and surfacing records for the segment; whether the same defect comes back between surfacing cycles is the evidence the defect rating of Table 3.8-10 is built on.