Report the reconnaissance in a short report or memorandum (Chapter 8.3). A structure that works well is shown below; the detail goes in appendices so the body can be read in a few minutes.
| Section | Content |
|---|---|
| Executive summary | Access, clearing, ground, boring locations, ditches, permits, in a few bullets |
| Site description | Location and land cover; soils and fill; flood zone, wetlands and bedrock; topography from lidar |
| Methods | Dates, who walked it, flagging, photographs, GPS accuracy and how errors were removed |
| Field observations | Access routes, vegetation, slopes and ground, ditches, obstructions |
| Boring locations and field changes | Relocations; locations near property lines, wetlands or utilities |
| Property, access and permits | Owners along each route; approvals needed |
| Estimated quantities | Clearing, trees, obstructions, mats (Chapter 3.6) |
| Conclusions and recommendations | Pathway to adopt, timing, mats, surveys, open items |
| Appendices | Figures, boring summary, route-by-route maps and profiles, species list, photo log |
For ground hazard sites the field worksheet of Chapter 3.8 is completed during the same visit, and its defect and indicator entries carry straight into the risk rating.