3.4.5 Documentation

Planning and carrying out the site visit, and recording what the ground, the drainage and the track are telling you.
Author: Daniel P. Colwell
3.4.5 Documentation

Photographs are the record of the reconnaissance, so take them systematically: at each boring, at each change in cover or ground along each route, and at every obstruction, crossing and utility. One recent reconnaissance produced 333 geotagged photographs along about 5,400 ft of flagged route; each was reviewed afterward for plant species, ground conditions and obstructions and overlaid on parcels, soils, wetlands and flood zones.

All reconnaissance photos333 photosPhotos showing buckthorn207 photosPhotos showing phragmites177 photosA photo can show more than one cover type
Figure 3.4-5. Cover types along the access routes of a wooded reconnaissance, counted from the photo log. Buckthorn and phragmites accounted for most of the clearing quantity (Chapter 3.6).
Table 3.4-6. Photo-log practice
PracticeReason
Geotag every photo, with compass directionPlaces the photo on the map; captions can give distance and direction from the nearest boring
Expect phone GPS accuracy of about 15 to 30 ft (worse under trees)State it in the report; do not use photo altitudes
Screen for GPS errors: photo pairs implying walking speeds above about 6 ft/sRemove jumps before measuring route lengths or areas
Caption only what the photo shows until field notes are addedKeeps observations separate from conclusions
Deliver the photos as a KMZ with clickable icons at each photo locationClients and drillers can follow the route; a one-page summary plus the KMZ is often what a busy reader wants