↑ Parent Menu⌂ Main Menu
← Chapter 3.4 Site Review and Reconnaissance
GHRM
Railway Ground Hazard Risk Management · 3.0 · Risk Management
Sections · open a dropdown to go to a section or subsection

3.4.10 Block Toppling of Rock Cuts

Planning and carrying out the site visit, and recording what the ground, the drainage and the track are telling you.
Author: Daniel P. Colwell
3.4.10 Block Toppling of Rock Cuts

Where bedding or foliation dips steeply into a cut, the kinematic screen of Section 3.4.9 flags toppling, and the next question is whether the toe can hold the columns above it. Wyllie and Mah (Chapter 9) present Goodman and Bray's limit equilibrium method for a slope made of rectangular blocks on a stepped base. The analysis works down from the crest. Short blocks near the top are stable. Taller blocks in the middle topple and push on the blocks below. The blocks at the toe are pushed until they slide. The force left at the toe, P0, decides the result: if it is positive the slope is unstable and needs support at the toe. The friction angle that brings P0 to zero gives a factor of safety, and anchors through the toe block are the usual repair. Kliche and the FHWA Rock Slopes manual describe the same failure mode.

3.4.10.1 Method

Equation 3.4-2. Toppling and sliding forces for block n (Wyllie and Mah Eqs. 9.23 and 9.25)

Pn−1,t = [Pn(Mn − Δx tanφd) + (Wn/2)(yn sinψp − Δx cosψp)] / Ln

Pn−1,s = Pn − Wn(cosψp tanφp − sinψp) / (1 − tanφp tanφd)
FS = tanφavailable / tanφrequired (Eq. 9.30)

A block topples when its height-to-width ratio exceeds cot ψp. The larger of the two forces governs, and once sliding governs it does so for every block below. The stepped base angle ψb cannot be measured directly. Wyllie and Mah suggest ψp + 10° to ψp + 30°, and recommend checking that range for the least stable case.

Table 3.4-10. Verification against Wyllie and Mah's Figure 9.10 (forces in kN/m; calculator run in English units and converted)
Force on the face below blockPublishedCalculator
P12 (from block 13)292.5292.5
P11 (from block 12)825.7825.9
P10 (from block 11)1556.01556.4
P9 (from block 10)2826.72827.6
P8 (from block 9)3922.13923.3
P7 (from block 8)4594.84596.1
P6 (from block 7)4837.04838.2
P5 (from block 6)4637.54638.5
P4 (from block 5)3978.13978.8
P3 (from block 4)2825.62825.7
P2 (from block 3)1413.51413.0
P1 (from block 2)472.2471.2
Blocks stable / toppling / sliding3 / 10 / 33 / 10 / 3

Published example: a 92.5 m (303.5 ft) face at 56.6°, layers dipping 60° into the face, 10 m (32.8 ft) blocks, a 3.3-ft (1 m) step per block, φ = 38.15° and 159 pcf (25 kN/m³); the block heights and the constants a1 = a2 = 16.4 ft (5 m) are taken from the book's table. With these, the toe force is essentially zero, so the required friction angle is about 38.2°. Wyllie and Mah quote 39° and FS = 0.97, found by raising the friction angle in steps.

3.4.10.2 Worked example

The same slope was run with the block heights generated by the calculator from the geometry (16 blocks, block 10 at the crest). The pattern is the same: three stable blocks at the top, ten toppling and three sliding at the toe. The toe force is 2.6 kips/ft, the required friction angle 38.19°, and the factor of safety 1.00. The slope is at limiting equilibrium, so a small loss of friction from weathering or water starts it moving from the toe. A toe anchor force of 0.8 kips/ft just balances the toe block. A design would carry a margin above that and check the anchor against Wyllie and Mah's Equations 9.26 to 9.29.

Along track, toppling usually announces itself as open tension cracks parallel to the crest and blocks leaning out at the toe. The toe blocks carry the whole slope. Never remove them to widen a ditch without first analyzing the slope, and treat new movement at the toe as an Urgent inspection rating (Section 3.8.29).

Open the rock toppling calculator →
Goodman and Bray toppling analysis block by block, from slope geometry or entered block heights: forces, modes, the toe force P0, the friction angle for limiting equilibrium, the factor of safety and the toe anchor force.

3.4.10.3 Sources in the library

These documents are in the reference library. The summaries above are paraphrased; equations and tabulated values are standard or published. Individual railroads, clients and projects are not named.

  • D.C. Wyllie and C.W. Mah, Rock Slope Engineering: Civil and Mining, 4th edition: Chapter 9, kinematics and limit equilibrium analysis of block toppling (Section 9.4, Figure 9.10)Find source ↗
  • C.A. Kliche, Rock Slope Stability (SME): toppling failureFind source ↗
  • FHWA, Rock Slopes: Design, Excavation, Stabilization, FHWA-TS-89-045 (1989): rock slope failure modes and stabilizationFind source ↗
← Previous · 3.0 Risk Management Chapter 3.3 — Drilling Scope
Next · 3.0 Risk Management → Chapter 3.5 — Site Conditions