Slake Durability of Shale and Weak Rock
Use and limitations
This calculator implements the method described in the manual section linked above. It is for planning, checking and teaching; design values must come from site-specific data, the governing railroad and agency standards, and the judgment of the responsible engineer.
Sources
- T.S. Nagaraj, Principles of Testing Soils, Rocks and Concrete (1993): Section 9.5.1.
- Franklin and Chandra (1972); Gamble (1971); ASTM D4644.
GHRM · Railway Ground Hazard Risk Management · Daniel P. Colwell