2.2.4 Unified Soil Classification System (USCS — ASTM D2487)

Consistent, reproducible classification of soil and rock is the common language shared between field personnel, laboratory technicians, design engineers, and railroad…
Authors: Daniel P. Colwell and Mario Ruel
2.2.4 Unified Soil Classification System (USCS — ASTM D2487)
2.2.4.1 Classification Flowchart Logic

Step 1 — Coarse or Fine?

  • If more than 50% is retained on the No. 200 sieve → Coarse-grained (G or S prefix)
  • If 50% or more passes the No. 200 sieve → Fine-grained (M, C, or O prefix) or Highly Organic (Pt)

Step 2 — For Coarse-grained soils:

  • If more than 50% of the coarse fraction is retained on the No. 4 → Gravel (G); else → Sand (S)
  • If fines < 5%: classify as W (well-graded) or P (poorly graded) using C_u and C_c
  • If fines 5–12%: dual symbol (e.g., GW-GM)
  • If fines > 12%: classify fines as M (non-plastic) or C (plastic) using Atterberg limits

Step 3 — For Fine-grained soils (plot on Casagrande Plasticity Chart):

Equation 2.2-8 — A-line (boundary between clay and silt/organic):

PI = 0.73 × (LL − 20)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
PIplasticity index = 0.73 × (LL − 20)Lab testPI = LL − PL from Atterberg limits (ASTM D4318).CL 7–30, CH 25–80 · by USCS group
LLliquid limitLab testAtterberg limits (ASTM D4318) on the minus No. 40 fraction.CL 20–50, CH 50–110 · by USCS group
Equation 2.2-9 — U-line (upper bound of natural soils):

PI = 0.9 × (LL − 8)

Classification matrix:

Position on ChartLL < 50 (Low Plasticity)LL ≥ 50 (High Plasticity)
Above A-lineCL (lean clay)CH (fat clay)
Below A-line or PI < 4ML (silt)MH (elastic silt)
Organic (LL_oven < 0.75 × LL_wet)OLOH
Fibrous, very high water contentPt (peat)Pt

Borderline classifications (e.g., CL-ML for soils plotting near the A-line with 4 ≤ PI ≤ 7) must be noted on boring logs submitted to the owner railroads — ASTM D2487 itself requires the dual symbol in this zone.

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
PIplasticity index = 0.9 × (LL − 8)Lab testPI = LL − PL from Atterberg limits (ASTM D4318).CL 7–30, CH 25–80 · by USCS group
LLliquid limitLab testAtterberg limits (ASTM D4318) on the minus No. 40 fraction.CL 20–50, CH 50–110 · by USCS group
Supplemental reference

Field identification of fines before lab results arrive

Field logs use the visual-manual procedure (ASTM D2488). The USACE field tests, run on the minus No. 40 fraction:

TestProcedureInterpretation
DilatancyShake a 1-in. pat of moist soil in the palm, then squeeze itVery fine clean sand: quick, distinct water and gloss. Inorganic silt: moderately quick. Plastic clay: no reaction.
Dry strengthDry a putty-consistency pat and crumble it between the fingersStrength increases with plasticity; high for fat clay. Silts and silty sands are slight — sand feels gritty, silt feels like flour. Break on a fresh surface, not a shrinkage crack.
ToughnessRoll a 1/8-in. thread repeatedly until it crumbles at the plastic limit, then knead the piecesStiffer threads and tougher lumps at the PL indicate higher clay content.
RibbonFlatten a 1/2–3/4 in. roll to 1/8–1/4 in. thickHigh-plasticity clay: 8–10 in. ribbon; shorter for lower plasticity; non-plastic soil will not ribbon.
Soil Index Properties
Soil Index Properties
Dilatancy test: squeezing the shaken pat &mdash; water and gloss disappear and the soil stiffens and cracks.
Supplemental Figure 8-S1. Dilatancy test: squeezing the shaken pat — water and gloss disappear and the soil stiffens and cracks. Source: U.S. Army Corps of Engineers (2001). Geotechnical Investigations. EM 1110-1-1804.
Ribbon test: moist soil flattened to a 1/8&ndash;1/4 in. ribbon; high-plasticity clays form ribbons 8&ndash;10 in. long.
Supplemental Figure 8-S2. Ribbon test: moist soil flattened to a 1/8–1/4 in. ribbon; high-plasticity clays form ribbons 8–10 in. long. Source: U.S. Army Corps of Engineers (2001). Geotechnical Investigations. EM 1110-1-1804.
Figure 2.2-12. The dilatancy (shaking) test.
Figure 2.2-12. The dilatancy (shaking) test.
Figure 2.2-13. The toughness test: rolling a 1/8-in. thread.
Figure 2.2-13. The toughness test: rolling a 1/8-in. thread.

USACE also lists quick checks for organic matter (odor), calcium carbonate cementation (dilute HCl), and whether a “rock-like” material is shale (slaking in water). Record color with Munsell soil color charts — color reflects mineralogy, drainage, and organic content.

Source: U.S. Army Corps of Engineers (2001). Geotechnical Investigations. EM 1110-1-1804

Field identification of fine-grained soil

Coarse vs. fine follows the 50-50 rule: more than 50% passing the No. 200 sieve is fine-grained, and in coarse soils the No. 4 sieve separates sand from gravel. In a name like “silty sand,” the second word is the predominant material. Clay particles carry a charge that gives cohesion and plasticity; silt does not. Dry silt blows away as dust, wet silt feels slippery and wet clay feels sticky. The distinction matters operationally, because silts and fine sands can fail very rapidly while deep clay embankments tend to creep.

Figure 2.2-11. Relative particle sizes of gravel, sand, silt and clay.
Figure 2.2-11. Relative particle sizes of gravel, sand, silt and clay.
Table 2.2-3. Field tests for fine-grained soil
TestSiltLow-plasticity clayHigh-plasticity clay
Dilatancy (shake a wet pat)Water appears quickly; pat loses shapeWater appears slowly; holds shapeNo change
Toughness (roll a 1/8-in. thread)Difficult to roll any threadEasy, moderately plastic threadPossible but difficult; very stiff
Dry strength (crush a dry 1/8-in. piece)Crumbles with little pressureModerateCannot be broken with fingers

Plasticity index guide used in the course: 0 non-plastic, 1–5 slightly plastic, 5–10 low, 10–20 medium, 20–40 high, and 40+ very high. Organic soils (topsoil, peat) are identified by fiber, color and odor and should be avoided as subgrade.

After Geotechnology for Railroaders Program, Module 2; §08, §10. Full reference under Supplemental References.

Classification cautions for track subgrade

  • The majority component does not always control behavior. A soil that is 60% gravel with clay-filled voids behaves like clay. AASHTO’s 35% fines cutoff between granular and silt-clay materials reflects this better than the 50% boundary in USCS.
  • c and φ depend on drainage and saturation, not on soil name. “Sand: c = 0” holds only for drained (or dry) conditions. “Clay: φ = 0” holds only for saturated undrained loading. Partially saturated subgrade usually has to be analyzed in total stress with both c and φ non-zero. Treating these as fixed soil constants is a common source of analysis error.
  • Classification tests use disturbed samples. They say nothing about in-place moisture, strength or stiffness. Pair them with in situ testing or undisturbed samples.
  • Be consistent. Use the ASTM D2488 visual-manual flow charts and modifiers consistently: “with sand” at 15–25% coarse material, and a “sandy” prefix at 30% or more. Soil naming is often done poorly in practice.
  • Ballast sources. For rock being assessed as a ballast source, classify by petrographic thin section (ground to 0.03 mm, with carbonate and feldspar staining) as well as by hand specimen (Chapter 2.3, §3.3.2).
Figure 2.2-14. Field decision flow for classifying an unknown soil.
Figure 2.2-14. Field decision flow for classifying an unknown soil.

After Selig & Waters (1994), ch. 3. Full reference under Supplemental References.

2.2.4.2 USCS Classification Procedure and Calculator

ASTM D2487 (in the library's Soil Mechanics folder) defines the Unified Soil Classification System as a fixed sequence of decisions: fines content first, then the predominant coarse fraction or the plasticity chart, then gradation, and finally the modifiers that make up the group name. Getting the name right matters on railroad work because the name carries the behavior: a CL subgrade pumps when wet, an ML is frost susceptible and erodible, and an SP-SM may be suitable subballast while an SC is not.

2.2.4.2.1 Procedure

Table 2.2-4. D2487 decision sequence used by the calculator
StepTestOutcome
1Fines (passing No. 200) ≥ 50%?Yes: fine-grained (CL, ML, CH, MH, OL, OH). No: coarse-grained.
2Coarse: gravel > sand?Gravel (G) or sand (S)
3Coarse with fines < 5%Well graded (Cu ≥ 4 gravel or ≥ 6 sand and 1 ≤ Cc ≤ 3): GW/SW; otherwise GP/SP
4Coarse with fines 5 to 12%Dual symbol, e.g. SP-SM, SW-SC
5Coarse with fines > 12%GM, GC, SM, SC (or GC-GM, SC-SM if fines are CL-ML)
6Plasticity chartA-line PI = 0.73(LL − 20); CL-ML band PI 4 to 7; LL 50 divides low and high plasticity
7Modifiers“with sand/gravel” at 15% or more; “sandy/gravelly” when the coarse fraction of a fine-grained soil is 30% or more

Equation 2.2-15. Gradation coefficients

Cu = D60/D10   Cc = D30²/(D10 D60)

2.2.4.2.2 Worked examples

Table 2.2-5. Two subgrade samples (calculator output)
SampleDataClassification
Embankment fill18% gravel, 55% sand, 27% fines; LL 34, PL 19SC, clayey sand with gravel
Soft subgrade under a pumping joint2% gravel, 10% sand, 88% fines; LL 63, PL 25CH, fat clay

Open the USCS classification calculator →
Group symbol and group name from gradation and Atterberg limits per ASTM D2487, with a plasticity chart and a railroad note for the group.

Example 2.2-4: Classifying Two Subgrade Samples

These are the two samples of Table 2.2-5, classified by hand so the calculator output can be checked. One is a sandy embankment fill; the other is the soft subgrade under a pumping joint.

102030405060708090102030405060A-lineU-lineCLCHMLMH or OHLL = 50Liquid limit, LL (%)Plasticity index, PI (%)A: LL 34, PI 15B: LL 63, PI 38GivenA: 18% gravel, 55% sand, 27% fines LL 34, PL 19 (embankment fill)B: 2% gravel, 10% sand, 88% fines LL 63, PL 25 (soft subgrade)RequiredUSCS group symbol and namefor each sampleA = ? B = ?Black = given; red = required
Given and required for Example 2.2-4: the fines of both samples on the plasticity chart.

Given

VariableValueDescription
Sample A18% gravel, 55% sand, 27% fines; LL = 34, PL = 19Embankment fill
Sample B2% gravel, 10% sand, 88% fines; LL = 63, PL = 25Soft subgrade under a pumping joint

Required

  • USCS group symbol and group name for each sample

Equations

  1. Eq. 2.2-5: PI = LL − PL
  2. Eq. 2.2-8: PIA = 0.73 (LL − 20) — A-line
  3. Rule: Fines over 12% in a coarse soil ⇒ SM or SC; 15% or more gravel in a sand ⇒ “with gravel”; coarse fraction under 15% in a fine soil ⇒ no modifier — ASTM D2487 (Table 2.2-4)

Steps

Step 1 · Sample A: coarse or fine?
Fines 27% < 50%; sand 55% > gravel 18%
Coarse-grained sand; fines over 12% ⇒ SM or SC
↓
Step 2 · Sample A: what are the fines?
PI = 34 − 19 = 15; PIA = 0.73 × 14 = 10.2; PI > PIA
Clayey fines: SC; gravel 18% ≥ 15% ⇒ clayey sand with gravel
↓
Step 3 · Sample B: coarse or fine?
Fines 88% ≥ 50%
Fine-grained
↓
Step 4 · Sample B: plasticity
PI = 63 − 25 = 38; PIA = 0.73 × 43 = 31.4; PI > PIA; LL > 50
CH; coarse fraction 12% < 15% ⇒ fat clay
Spot check: Both samples agree with the calculator output in Table 2.2-5.
↓
Solution
A: SC, clayey sand with gravel. B: CH, fat clay.

Solution

Sample A: SC, clayey sand with gravel. Sample B: CH, fat clay.

The fat clay under the pumping joint is the classic pumping material: high plasticity, weak when wet, and fine enough to be carried up into the ballast. The clayey sand fill is serviceable but its plastic fines make it sensitive to drainage. Checking calculator output by hand like this once per project catches data entry errors early.

2.2.4.2.3 Sources in the library

These documents are in the reference library. The method summaries above are paraphrased; equations are standard forms.

  • ASTM D2487-17(2025), Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System), Soil Mechanics folder.Official page ↗Library entry
  • Basic Soil Characteristics (course notes) and Soil Mechanics Laboratory Manual, Soil Mechanics folder.Find source ↗Library entry
  • An Introduction to Geotechnical Engineering (Holtz and Kovacs), Soil Mechanics folder: classification background.Find source ↗
Supplemental reference · Goswami (2015), Ch. 203

Reading Burmister Descriptions on Older Logs

Many older boring logs, especially in the northeastern United States, use the Burmister system instead of USCS. It describes soil by its principal component in capitals and the minor components with proportion terms:

Burmister proportion terms
TermPercent by weightExample
(principal, in capitals)over 50SAND
and35 to 50SAND and GRAVEL
some20 to 35SAND, some silt
little10 to 20SAND, little gravel
trace1 to 10SAND, trace silt

Gradation of the principal component is shown by size terms (coarse, medium, fine), for example “c-f SAND” for coarse-to-fine sand. Plasticity of fines is described separately, so a Burmister description alone does not give a USCS group.

For railroad work: Railroad files often hold decades-old logs written in Burmister terms. Translate them to approximate USCS groups for the desktop study (Chapter 3.2), treating the result as provisional until confirmed by new samples and index tests. “Some silt” (20% to 35%) can mean a fines content that changes the soil from SM-type behavior to frost-susceptible and pumping-prone subgrade (Section 2.2.7).

Source: Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education, Chapter 203, Burmister Soil Classification System. Full reference under Supplemental References.