| Sample ID | Depth (ft) | % Pass No. 200 | LL (%) | PL (%) | PI (%) | USCS | AASHTO | GI | LI | Notes |
|---|---|---|---|---|---|---|---|---|---|---|
| B-1, S-2 | 3–5 | 68 | 52 | 22 | 30 | CH | A-7-6 | 19 | 0.83 | Fat clay; soft consistency; swell concern |
| B-1, S-4 | 8–10 | 44 | 38 | 19 | 19 | CL | A-6 | 4 | 0.47 | Lean clay; medium stiff |
| B-2, S-1 | 1–3 | 22 | 28 | 14 | 14 | SC | A-2-6 | 0 | 0.21 | Clayey sand; fill material suspected |
| B-2, S-3 | 6–8 | 78 | 61 | 27 | 34 | CH | A-7-6 | 28 | 1.05 | Fat clay; LI > 1.0 indicates near-liquid state |
| B-3, S-2 | 4–6 | 12 | NP | NP | NP | SP-SM | A-2-4 | 0 | — | Fine sand with silt; non-plastic |
| B-3, S-5 | 14–16 | 55 | 44 | 21 | 23 | CL | A-7-6 | 10 | 0.63 | Lean clay; plots above the A-line |
B-2, S-3 at 6–8 ft: LI = 1.05 and GI = 28 indicate very poor subgrade.