RQD is calculated from rock core runs per the procedure established in Chapter 4.1. To summarize:




RQD (%) = [Σ length of sound core pieces ≥ 4 in.] / [Total core run length] × 100
| RQD (%) | Rock Quality |
|---|---|
| 0–25 | Very Poor |
| 25–50 | Poor |
| 50–75 | Fair |
| 75–90 | Good |
| 90–100 | Excellent |
Calculate and record RQD on every core run. Confirm any owner-specific uses of RQD, such as rock acceptance criteria, against the owner railroad's current standards.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| RQD (%) | [Σ length of intact core pieces ≥ 2 in.] / [Total core run length] × 100 | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
RMR classifies the overall rock mass quality using six parameters, each assigned a rating:

RMR = R₁ + R₂ + R₃ + R₄ + R₅ + R₆
| Parameter | Rating Range | Description |
|---|---|---|
| R₁ — UCS (psi) | 0–15 | UCS < 145 psi (1 MPa) → 0; UCS > 36,000 psi (250 MPa) → 15 |
| R₂ — RQD (%) | 3–20 | RQD 0–25% → 3; RQD 90–100% → 20 |
| R₃ — Spacing of discontinuities | 5–20 | < 2.4 in. → 5; > 6.6 ft → 20 |
| R₄ — Condition of discontinuities | 0–30 | Soft infill > 0.2 in. → 0; very rough, unweathered → 30 |
| R₅ — Groundwater | 0–15 | Flowing water → 0; dry → 15 |
| R₆ — Discontinuity orientation | 0 to −60 | Adjustment for orientation: 0 to −12 for tunnels, 0 to −25 for foundations, 0 to −60 for slopes |
| RMR | Rock Class | Description |
|---|---|---|
| 81–100 | I | Very good rock |
| 61–80 | II | Good rock |
| 41–60 | III | Fair rock |
| 21–40 | IV | Poor rock |
| 0–20 | V | Very poor rock |
RMR is used on Class I railroad tunnel feasibility studies and on Class I railroad bridge pier excavation designs in the Canadian Shield. RMR is a common basis for classifying rock cut stability.
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| RMR | R₁ + R₂ + R₃ + R₄ + R₅ + R₆ | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
GSI provides a rock mass characterization input for the Hoek-Brown failure criterion, used in rock slope stability analyses (Chapter 6.3) for Class I railroad projects. GSI is estimated from field observation of structure and surface condition of discontinuities:
σ'₁ = σ'₃ + UCS × (m_b × σ'₃/UCS + s)^a
Where:
Include the GSI estimation chart used (Marinos and Hoek 2000), with the selected value marked, as a figure in the geotechnical data report (Chapter 8.4).
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| UCS | uniaxial compressive strength of intact rock (psi) | Lab test | Uniaxial compression of rock core (ASTM D7012); point load index (D5731) for screening. | shale 1,000–15,000; sandstone 5,000–25,000; granite 15,000–40,000 psi |
| mb | reduced Hoek-Brown constant = m_i × exp((GSI − 100)/(28 − 14D)) | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| s | intermediate value computed on this page | Another equation | Computed: s = exp((GSI − 100)/(9 − 3D)) | project-specific |
| a | intermediate value computed on this page | Another equation | Computed: a = 0.5 + (1/6)(exp(−GSI/15) − exp(−20/3)) | project-specific |
| D | disturbance factor (0 = undisturbed | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| mi | intact rock constant (from Hoek-Brown tables | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |

The Q-system (Tunneling Quality Index) is used when Class I railroad projects involve tunnel or large underground excavation design:
Q = (RQD / J_n) × (J_r / J_a) × (J_w / SRF)
Where:
| Q | Rock Class | Support Category |
|---|---|---|
| > 40 | Very good or better | Spot bolting |
| 10–40 | Good | Systematic bolting |
| 1–10 | Fair to poor | Shotcrete + bolts |
| 0.1–1 | Very poor | Multiple passes |
| < 0.1 | Extremely poor | Heavy support |
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Q | (RQD / J_n) × (J_r / J_a) × (J_w / SRF) | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| Jn | joint set number (3 for one set | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| Jr | joint roughness number (1 = smooth planar | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| Ja | joint alteration number (1 = unaltered | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| Jw | joint water reduction factor (1 = dry | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
| SRF | stress reduction factor (1 = low stress | Field mapping / core logging | From core logs and outcrop mapping using the cited rating tables (RQD per ASTM D6032; joint spacing, condition, water). | see rating tables |
ASTM D6032, FHWA GEC 5 and the USBR field manual all define RQD using sound core pieces 4 in. or longer, measured along the core centerline, as Chapter 4.1 (Section 4.1.5.2) states. GEC 5 adds two rules often missed: pieces that are not hard and sound are excluded even if longer than 4 in. (so weathered rock is downgraded), and RQD is not appropriate for BQ/BX core — NQ/NX is optimal.
Table 8-S1. Rock material strength grades (GEC 5, Table 37)
| Grade | Description | Field identification | UCS range (psi) |
|---|---|---|---|
| R0 | Extremely weak | Indented by thumbnail | 36–145 |
| R1 | Very weak | Crumbles under firm blows of hammer point; peeled by pocket knife | 145–725 |
| R2 | Weak | Peeled by knife with difficulty; shallow indentations with firm hammer blow | 725–3,600 |
| R3 | Medium strong | Cannot be scraped or peeled with knife; fractured with single firm blow | 3,600–7,250 |
| R4 | Strong | More than one blow needed to fracture | 7,250–14,500 |
| R5 | Very strong | Many blows needed to fracture | 14,500–36,000 |
| R6 | Extremely strong | Can only be chipped | > 36,000 |
Table 8-S2. Weathering grades (GEC 5, Table 38)
| Grade | Term | Description |
|---|---|---|
| I | Fresh | No visible weathering; slight discoloration on major discontinuities possible |
| II | Slightly weathered | Discoloration of rock material and discontinuity surfaces; surface may be somewhat weaker |
| III | Moderately weathered | Less than half decomposed/disintegrated to soil; fresh or discolored rock as framework or corestones |
| IV | Highly weathered | More than half decomposed/disintegrated to soil; rock as framework or corestones |
| V | Completely weathered | All decomposed to soil; original mass structure largely intact |
| VI | Residual soil | All converted to soil; structure and fabric destroyed; not significantly transported |
A complete rock description strings these together in a set order, e.g. “slightly weathered, crystalline, gray, fine-grained, medium strong (R3) basalt,” followed by a rock-mass description of joint sets, spacing, persistence, infilling, roughness and seepage (GEC 5, after Wyllie). The strength grade gives the R1 input to RMR when no UCS test is available.
Source: Sabatini, P. J. et al. (2002). Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular No. 5, FHWA-IF-02-034 (superseded by GEC 5, Geotechnical Site Characterization, FHWA-NHI-16-072 (2017)) · U.S. Bureau of Reclamation (1998). Engineering Geology Field Manual, 2nd ed., Vol. I

If an excavator can dig it, treat it as soil; once rock breaks apart, it behaves like soil. Igneous extrusive rock cooled quickly (basalt) is fine-grained and dark, and it is the preferred ballast family: the darker and finer, the better. Slowly cooled granite is coarser and less suitable. Sedimentary rock (sandstone, limestone) and metamorphic rock are generally not recommended for ballast; soft rock can grind into a mud spot within a few years.

After Geotechnology for Railroaders Program, Module 2, Module 3; Module 2 §07; Module 3 §05. Full reference under Supplemental References.